Overhead Line Construction – 380 Kv Overhead Line Preilack – Streumen (559/560). The Project Sponsor 50Hertz Transmission Gmbh (50Hertz) Is Planning The Measure “Relocation Of The 380 Kv Preilack-Streumen Overhead Line (559/560) In The Area Of The Former Greifenhain Opencast Mine”. The Measure Covers A Total Of Approximately 5.2 Km Long Pipeline. The Existing 380 Kv Line Will Be Replaced By New Masts Between Masts 85 And 96 And The Existing Masts Will Be Dismantled In Close Proximity To The Construction Of The 380 Kv Line. The Measure “Relocation Of The 380 Kv Preilack-Streumen Overhead Line (559/560) In The Area Of The Former Greifenhain Opencast Mine” Is Approved By The Responsible State Authority Of The Affected Federal State, The State Office For Mining, Geology And Raw Materials In Cottbus. According To Current Knowledge, Planning Approval Is Expected At The End Of 2024. 50Hertz Is Planning To Replace The Existing 380 Kv Line Preilack - Streumen On The Section That Runs Through The Former Greifenhain Opencast Mining Area By Rerouting The Route Through The Former Opencast Mine Due To An Acute Risk Of Accident. The Existing Pipeline In The Former Greifenhain Opencast Mining Area Will Then Be Dismantled Between The Existing Masts 85 And 96 (12 Pieces). The Subject Of The Present Plan Approval Procedure In The Federal State Of Brandenburg With The Approval Authority Lbgr Is The Replacement New Building Over A Length Of 5.2 Km From Mast 85N (Old 85) To Mast 99N (Old 96) (15 Pieces)
Contact Information
Address
Heidestraße 2
Contact No.
+493051504863
Email
Oliver.Engel@50hertz.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 81728159
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.