Plumbing And Drain-Laying Work – Installation Of The Drainage System According To Din 18381. Renovation Of Underground Car Park 3Rd Construction Phase New Town Hall The Main Execution Work Is: - Drainage Work According To Din 18381 1,095 M Sewer Pipe Made Of Cast Iron Dn 50 To Dn 200 1,884 Pieces. Pipe Clamp, Zinc-Plated Steel L Up To 0.5M Dn 50 To Dn 200 485 Pieces. Elbow 45 Degree Cast 2K- Epoxy Coating Dn 50 To Dn 200 172 Pieces. Elbow 88 Degree Cast 2K Epoxy Coating Dn 50 To Dn 125 1,664 Pieces. Rubber Sleeve Profile Clamp Cast Dn 50 To Dn 200 121 Pieces. Safety Clamp, Tensile Cast Dn 50 To Dn 200 33 Pieces. Fixed Point Cast Sewer Pipe Dn 80 To Dn 200 15 Pcs. Fire Protection Insulation Cast Iron Pipe Ad 135Mm To Od 210Mm 450 Kg Hot-Dip Galvanized Steel Construction 60 M Pp Sewer Pipe Hot Water Resistant Dn 125 To Dn 150 Inlets And Cleaning Openings 88 Pcs. Floor Drain Cast Bucket Dn 70 88 Pcs. Fire Protection Insert Floor Drain Dn 70 88 St. Fire Protection Installation Kit Floor Drain Dn 70 Insulation On Wastewater Pipes 540 M Cold Insulation Dn 100 To Dn 150
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 81427648
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.