Ventilation And Air-Conditioning Installation Work – Lüftung. The Hamburg Real Estate Company For Police And Fire Department Buildings Mbh & Co Kg Intends To Build A Fire And Rescue Station With A Shed For The Hamburg Fire Departments Emergency Vehicles On A Property In Schnelsen That Is Directly Adjacent To Schleswiger Damm. Project Management Is Carried Out By Sprinkenhof Gmbh. The Building Has 3 Floors. The Vertical Access Takes Place Via 3 Stairwells And Various Slide Shafts. A Sports Field Is Located On The Roof Of The Building And Is Shielded From The Natural Area By A Ball Guard. An Indoor Sports Area Is Also Planned On The Upper Floor. General Key Data: Building Class: Gk 3 According To Hbauo / Unregulated Special Building Gross Floor Area (R): Approx. 5,215 M² Gross Floor Area (S): Approx -5 Building Length: Approx. 85 M Building Width: Approx. 24-29 M Building Height: Approx. 15 M Tower Height: Approx. 22 M The Building Will Be Equipped With Two Central Ventilation Systems And A Separate Kitchen Exhaust System. An Exhaust Gas Extraction System Must Be Implemented For The Vehicle Halls. The List Of Services For The Ventilation Work Includes: // Central Devices And Exhaust Gas Extraction Systems // Fire Dampers // Air Outlets And Air Distribution // Decentralized Circulating Air Cooling Essential Work: // Central Air Conditioning Unit With 1,000 M³/H // Central Air Conditioning Unit With 33,000 M³/H // Exhaust Gas Extraction Systems ( 4 Systems) // 114 Fire Dampers // Decentralized Circulating Air Cooling (15 Kw)
Contact Information
Address
Gustav-Mahler-Platz 1
Contact No.
+49 40339540
Email
sprvergabestelle@sprinkenhof.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 80663665
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.