Tender For request for proposal for SCADA/DMS Implementation for RDSS Works in NDMC-1 Form : 1 Project Management Cost 2 Installation,TestingandCommissioningCostto IntegrateEntireSCADA&IT(relevanttoSCADA)Infrastructure 3 Integration withlegacyapplications&DataMigration 4 TrainingfortheEmployees (refer form 9) 5 Form: 2 SCADA/DMS Control Centre Cost (BoQ) 6 C1: Server/ workstationHardware 7 SCADA Server 8 DMS Server 9 OMS Server 10 FEP server with interface switches 11 ISR server 12 NMS server 13 DTS server 14 Other Active Devices 15 Developmental server 16 Communication Server 17 Web/Directory server 18 SMS gateway 19 Workstation with dual TFT Monitors ( S/S monitoring) 20 Workstation with dual TFT Monitors (Network monitoring) 21 Remote VDUs with one TFT Monitors 22 Developmental console with one TFT 23 DTS/Workstation Console with dual TFTs 24 Video Projection system with 3x4 ( rows x columns) Module configuration with each module at least 60" diagonal with projector 25 Storage & Backup Devices 26 External RAID Mass storage device ( for 24 months online backup) 27 External DAT Drive 28 Switches 29 Layer II Switch (SCADA/DMS LAN) 30 Layer II Switch (Planning & Development system LAN) 31 Routers 32 Router for interfacing IT system & SCADA/DMS DR Centre 33 Router at remote VDU 34 Security System (DMZ) 35 Web server with load balancing 36 Mail Server 37 Router 38 Firewall & Network IDS/IPS 39 Layer II Switch 40 Other Active Device 41 GPS Time Synchronization System 42 Time, day & date digital displays 43 Printer 44 Color Inkjet Printer 45 B/W Laser printer 46 Any other items required to meet functional / performance requirement as per MTS 47 C2: Software for Control Center 48 SCADA Software 49 ISR Software 50 DMS Software 51 OMS Software 52 DTS Software 53 Development Software 54 Network Management Software 55 WEB/Network Security Software (INCL IN WEBSERVER) 56 RDBMS Package (Incl in ISR) 57 GIS Software(enterprise license) with necessary license cost, hardware cost, survey cost and any other cost required for complete new GIS solution for A town or GIS Adaptor/Engine for importing data from GIS system under IT system 58 Any other software to meet functional/performance requirements of MTS 59 C3: Mandatory Spares MAX 5% of C1 60 Mandatory Spares 61 Form : 3 SCADA/Disaster Recovery Control Cost (BoQ) 62 D1: Server/ workstationHardware 63 SCADA Server 64 DMS Server 65 OMS Server 66 FEP server with interface switches 67 ISR server 68 NMS server 69 DTS server 70 Other Active Devices 71 Developmental server 72 Communication Server 73 Web/Directory server 74 SMS gateway 75 Workstation with dual TFT Monitors ( S/S monitoring) 76 Workstation with dual TFT Monitors (Network monitoring) 77 Remote VDUs with one TFT Monitors 78 Developmental console with one TFT 79 DTS/Workstation Console with dual TFTs 80 Video Projection system with 2X3 ( rows x columns) Module configuration with each module at least 60" diagonal with projector 81 Storage & Backup Devices 82 External RAID Mass storage device ( for 24 months online backup) 83 External DAT Drive 84 Switches 85 Layer II Switch (SCADA/DMS LAN) 86 Layer II Switch (Planning & Development system LAN) 87 Routers 88 Router for interfacing IT system & SCADA/DMS DR Centre 89 Router at remote VDU 90 Security System (DMZ) 91 Web server with load balancing 92 Mail Server 93 Router 94 Firewall & Network IDS/IPS 95 Layer II Siwtch 96 Other Active Device 97 GPS Time Synchronization System 98 Time, day & date digital displays 99 Printer 100 Color Inkjet Printer 101 B/W Laser printer 102 Any other items required to meet functional / performance requirement as per MTS 103 D2: Software for Control Center 104 SCADA Software 105 ISR Software 106 DMS Software 107 OMS Software 108 DTS Software 109 Development Software 110 Network Management Software 111 WEB/Network Security Software (INCL IN WEBSERVER) 112 RDBMS Package (Incl in ISR) 113 GIS Software(enterprise license) with necessary license cost, hardware cost, survey cost and any other cost required for complete new GIS solution for A town or GIS Adaptor/Engine for importing data from GIS system under IT system 114 Any other software to meet functional/performance requirements of MTS 115 D3: Mandatory Spares MAX 5% of D1 116 Mandatory Spares 117 Form 4: E1: Remote Terminal Units (RTUs) 118 RTU base equipment comprising panels, racks, sub-racks, Power Supply modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring from panel/BTU/DT/PTR etc to RTU for all modules for locations mentioned including earthing arrangements, cable tray, glands, lugs etc as per site requirement, to meet functional, performance & availability requirements of SCADA. 119 Multifunction transducers (including DC transducers) 120 Contact Multiplying Relays (CMRs) 121 Heavy duty relays for Control 122 Dummy Breaker Latching Relays 123 Transformer Transducers including DC transducers 124 Single TFT PC for LDMS with 2KVA UPS 125 Any other hardware / necessary earthing to meet functional/performance requirement of MTS 126 E2: Software for LDMS 127 LDMS software 128 Any other software to meet functional /performance requirement of MTS 129 E3: TEST EQUIPMENTS forRTU 130 RTU Database Configuration & Maintenance Software tool 131 Master Station cum RTU Simulator & Protocol analysersoftware tool 132 Laptop PC for above software tools along with interfacinghardware including Hub 133 E4: MANDATORY SPARES FOR RTU 5% of E1 (E1: Remote Terminal Units (RTUs)) 134 Mandatory Spares 135 Form 6: G1: MPLS for RTUs 136 Annual charges for Min 10 MBps Links with RTUs 137 MPLS Router 138 Any other hardware to meet functional /performance requirementof MTS 139 G3: MANDATORY SPARES (5% of G1) 140 Mandatory Spares 141 Form 7: H1: Main Equipments - Control centre 142 UPSwithsuitableratingrunninginparallelredundantmode* incuding ACDB, earthing, power cabling etc. provisions to meet functional, performance & availability requirements of SCADAincluding VRLA type Battery banks for above UPS for minimum 30 min. backup duration 143 H2: Main Equipments - DR Centre 144 UPSwithsuitableratingrunninginparallelredundantmode* incuding ACDB, earthing, power cabling etc. provisions to meet functional, performance & availability requirements of SCADAincluding VRLA type Battery banks for above UPS for minimum 30 min. backup duration 145 H3: II For RTU / Data Concentrator / Communication Equipments. 146 DCPowerSupply(DCPS)systembasedonSMPS including all required cables to meet functional performance & availability requirements of SCADAandBattery bank for above DCPS (VRLA Type) for minimum 4 hrs backup 147 H5: Remote VDU location 148 UPS (2 kVA ) 149 H6: Mandatory Spares for UPS(5% of H1 to H6) 150 Mandatory Spares 151 Form 8: J5: 152 Numerical relay /BCPU 153 J6: MANDATORY SPARES (5% of J1 to J5 ) 154 Mandatory Spares 155 Form 9: Training (in Days), A: Operation"s Training 156 Operator for SCADA/DMS Control Centre 157 Instructor for DTS 158 B: Maintenance Training 159 Computer Hardware & System Software 160 Application Software (SCADA/DMS) 161 RTU & FRTU 162 Database & display development 163 Auxiliary Power Supply 164 Communication System including NMS 165 Form 10: Facility Management Services (FMS) 166 FMS charges for SCADA/DMS system (maintaining overall system availability as per TS) 167 FMS charges for SCADA/DMS system (maintaining availability individual hardware & software applications functions as per TS)
Contact Information
Contact Person
Executive Engineer (E) RDSS
Address
1804 18thFloor Palika Kendra Sansad Marg New Delhi 110001
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 80517096
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.