Boring Work Test – Drilling Performance I. Z. Ern. Earth Body In 4 Sections, Km 92.5-102.3. Str. 5501, Mü – Treuchtlingen. Carrying Out Subsoil Investigations (Including Laboratory Tests) On The Double-Track, Electrified Railway Line 5501, In Preparation For The Planned Dam Renovation. The Surveys Extend Over Four Sections (Km 92.5-93.05; Km 95.6-96.1; Km 97.853-98.3; Km 101.5-102.3) Both Inside And Outside The Track. In Addition To Direct Exploration (Core Drilling, Small Drilling, Exploration Pits), Indirect Exploration (Pressure And Heavy Ramming Soundings) Are Also Planned. A 54-Hour Tsp And A 167-Hour Esp Are Available For Exploration Within The Track.