Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Authorization For Drilling Near Supram, Temporary Facilities / Construction Shed For Well Drilling, Location Of Wells (Groundwater Studies) Grouped, On Demand, Mobilization And Displacement Of Teams, Equipment, Materials And Tools For Drilling Wells With Roto-Pneumatic Probe, Materials And Tools For Development And Testing Of Deep Well Flow, With Compressor (Poço Jardim), Commercial Road Transport (Material In General), Conditioned Cargo (Poço Jardim), Drilling In Alluvium And Inconsistent Layers - Hole Diameter = 8.1/2, Drilling In Alluvium And Inconsistent Layers - Hole Diameter = 10, Drilling In Alluvium And Inconsistent Layers - Hole Diameter = 12, Drilling In Rock, Diameter 6, Drilling In Rocha Sa - Hole Diameter = 8, Chemical Product For Removing Drilling Fluid And Cleaning Deep Tubular Wells - Supply And Application (Garden Well), Installation Of Pre-Filter, With Crushed Stone, Pipe For Feeding Pre-Filter For Deep Tubular Wells - Supply And Installation , Cementing Of The Annular Space With Cement Mortar And Sand In A Proportion Of 1:3, Simple Concrete Slab, Minimum Cement Consumption Of 200 Kg/M3, Thickness = 20 Cm, Diameter = 2.50 M, Well Protection Cover Deep In Smooth Black Steel Din2440 (Garden Well), Installation And Removal Of Test Piping (Garden Well), Installation Or Removal Of Coating Of Deep Tubular Wells In Black Carbon Steel, Galvanized Or Stainless Steel Pipes, Galvanized Steel Pipe With Seam, Class Average, Dn 6, E = 4.85 Mm, Weight 19.68 Kg/M (Nbr 5580), Well Disinfection Using Chemical Products (Poço Jardim, Physico-Chemical Analysis (Poço Jardim), Bacteriological Analysis (Poço Jardim) ), Structures Rental - Jig/Table For Construction, Land Cleaning With Manual Scraping, Masonry Passage Box (0.30 Exclusive Cables (Garden Well), Laying Of Screwable Rigid Pvc Conduit - Diameter 1, In Trenches, With Excavation In Soil And Landfill, Exclusive Conduit (Garden Well), Assembly And Installation Of Deep Tubular Well, Extraction Pipe Diameter Of 2 , Pump Installation Depth Between 6 0 M And 120 M (*Garden Well), Seamless Carbon Steel Tube 1 1/2, E= 3.68 Mm, Schedule 40, 4.05 Kg/M (*Garden Well), Cemig Standard Wall For Aerial Substation Of Up To 75 Kva, High Density Polyethylene Tube (Hdpe), Pe-80, Of = 20 Mm X 2.3 Mm Wall (Garden Well: +15M), Copper Cable, Flexible, Class 4 Or 5, Pvc/A Insulation, Bwf-B Flame Retardant, Pvc-St1 Cover, 1 Conductor, 0.6/1 Kv, Nominal Section 1.5 Mm2 (Garden Well), Nominal Section 10 Mm2 (* Poço Jardim), Galvanized Iron Sleeve, With Bsp Thread, 1 1/2 (Poço Jardim), 90 Degree Curve Galvanized Iron, With Male Bsp Thread, 1 1/2 (Poço Jardim), Barrile For Deep Well Diam 50 Mm, According To P. Copasa 068/- (Poço Jardim), Supply And Installation Of Vertical Axis Submerged Motor Pump Set, With Single-Phase 3-Wire Electric Motor 220V, 60Hz, Power Of 4, 50 Hp (Poço Jardim), Supply And Installation Control Panel And Protection For 220V, 5 Hp Single-Phase Motors (Poço Jardim), Axle Location - Rural Area (Poço Jardim: +0.56Km), Land Cleaning With Manual Scraping, Manual Excavation In Soil, Deep
|