Construction Work For Electricity Power Lines – “Overhead Electric Line (Lea) 400Kv Double Circuit (D.C.) With 1 Single Circuit Equipped (1 C.E.) Constanța North – Medgidia South. Lea 400 Kv Double Circuit (1 Equipped Circuit) Constanţa Nord - Medgidia Sud Will Be Made Up Of Two Distinct Sections: - A 400 Kv Overhead Power Line Section, Which Will Be Built On Donau Double Circuit Metal Poles And Will Equipped In The First Stage With A Safe Three-Phase Circuit Made Up Of 9 Acsr 300/69 Mm2 Type Active Conductors (3 Conductors Per Phase), Respectively With 2 Protective Conductors, One Of Which Is Opgw Type. The Length Of The Lea 400 Kv Double Circuit (1 Equipped Circuit) Constanţa North – Medgidia South Is Approximately 35.35 Km; - A Section Of Electric Line In Cable (Lec), A Circuit, Of 400 Kv That Will Be Made On The Final Portion Of The Connection In The Medgidia Sud Station (It Will Connect The Aerial Portion Of The Line With The Medgidia Sud Station) And Will Have A Length Of About 2 Km. In Order To Put Into Operation The Major Investment Lea 400 Kv D.C. (1 C.E.) Constanţa North - Medgidia South, The Pt+Cs Phase Design Documentation Was Initially Developed. This Includes All Written And Drawn, Initial And Indicative Pieces, Based On Which And After A Thorough Documentation In The Field, The Appointed Executor Of The Works, Who Will Also Have The Quality Of Execution Designer, Will Develop The Design Phases Specific To The Execution Of The Works, The Phases Of Design Pta (Updated Technical Project) And De, Which He Will Implement. As A Result Of The Implementation Of The Project, The Appointed Executor/Designer Will Take All The Necessary Steps And Will Make Available To Cntee Transelectrica Sa All The Necessary Documents For The Update Of The Gd Regarding The Expropriation For Reasons Of Public Utility And The Approval Of The Location, Gd Transfer Of Management Rights, Hg Removal From The Forestry Fund National, As The Case May Be. A Number Of Other Auxiliary Pta And De Are Also In Charge Of The Executor/Designer, Such As Those For Releasing The Site And/Or Creating Conditions For Coexistence With Electrical Networks Of The Zonal Od, With Public Roads, Railways, Tc Installations, Etc. These Types Of Projects Are Certified, Validated And Approved By Each Type Of Operator. All The Necessary Documentation To Obtain Agreements, Approvals, Authorizations Must Be Drawn Up, These Being Specific To The Type Of Design And Execution Contract Regulated By Gd 1/2018. The Construction Of The Lea Has As A Particularity The Fact That During The Execution, Countless Unforeseen Situations Occur Regarding The Land, Location, Owners/Users, Existing Or Future Constructions, Etc., Which Leads In Most Cases To The Need To Update And Complete The Agreements, Notices Authorizations Already Obtained And Implicitly When Updating The Necessary Documentation In This Regard. The Duration Of The Contract Is 30 Months And Consists Of: - Design Duration: 2 Months From The Date Of Issuance Of The Administrative Order To Start The Design Activity - Estimated Duration Of Making Available To The Contractor A Document
|