Construction Work – Federal Environment Agency - Dahlemer Triangle House 1 - Heating And Cooling Systems - Award 617/2024. Heating And Cooling Systems Atv Din 18380/18379 Quantity Or Scope Of The Order - Installation Of The Heating System With A Common Local Heat Transfer Station 826 Kw For New And Old Buildings - Installation Of A Heat Pump System Consisting Of 2 Geothermal Heat Pumps Each 75 Kw (Geothermal Probe Field On Site) With Natural Refrigerant ( Propane) - Heating Transfer In The New Building With Underfloor Heating And Static Radiators As Well As Static Radiators In The Old Building - Heating Pipe Network Approx. 3800 M Dn 15 - Dn 100 Made Of Welded Steel Pipe And Copper Pipe - 2 Cooling Machines 700 Kw Each (Ammonia Refrigerant) With Safety Equipment, Separate Dry Coolers On The Roof, Heat Exchanger For Free Cooling - Cold Transfer Via Circulating Air Cooler And Provision Of Laboratory Cooling Water - Cold Pipe Network, Laboratory Cooling Water Network, Re-Cooling Network Approx. 5000 M Dn 15 - Dn 250 Made Of Steel Pipe With Corrosion Protection And Stainless Steel Pipe - Maintenance Services Are Part Of The Tender - Duration 4 Years Start And End Of Order Execution: Start Of Execution: 12 Working Days After Receipt Of The Order Letter. Expected Start Of Assembly From May 6Th, 2025 End Of Execution: August 6Th, 2027 Including Trial Operation. Binding Individual Deadlines
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79472259
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.