Construction Work – Rv 5 Fodnes Tunnel. Parts Of The Existing Water And Frost Protection, The Aluminium Plate Vault Shall Be Demolished And Replaced With New Water/Frost Protection. 2 New Wreckage Works Shall Be Blasted With Technical Buildings. The Tunnel Shall Also Have New Lights Mounted On The Cablial Ladder. • Demolition Of Approx. 27,000 M2 Metal Plate Vault • New Installation Of Approx. 30,000 M2 Water And Frost Protection • Purge And Secure The Rock Behind The Plate Vault • Blasting 2 Wreckage Units With A Technical Building. • Blasting 4 Rock Rooms In Hanger For Mounting Of Ventilators Delivery And Installation Of 2 Technical Buildings. • Deliver And Assemble The Cable Ladder Through The Tunnel. • Excavating Ditch And Laying Conduits Where We Replace Water And Frost Protection. • Assemble Approx. 6,200 Metres Of Slide Stretched Banquet Edge. • Concrete From The Existing Banquet And From The Concrete Foundation Under The Slab Square Shall Be Delivered To Muggeteigen For Processing. (Removal Of Reinforcement And Crushing). • The Masses From The Concrete Tank Shall Be Used As Filling Matter/Refill Masses In Tunnel.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79096595
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.