Corrigendum - Quotation Are Invited For Hrsg73 Diverter Damper Blade Hanger Pin Keeper Plates Supply And Ins ... in United Arab Emirates
Tender Notice
TenderID
76979341
Tender Brief
Corrigendum - Quotation Are Invited For Hrsg73 Diverter Damper Blade Hanger Pin Keeper Plates Supply And Installation With Oem (M/S Bachmann) Approval At L1 Station
Quotation are invited for HRSG73 Diverter Damper Blade Hanger Pin Keeper Plates Supply and Installation with OEM (M/S Bachmann) Approval at L1 Station #Jebel Ali Power Station. HRSG73 DIVERTER DAMPER BLADE HANGER PIN KEEPER PLATES SUPPLY ANDINSTALLATION WITH OEM (M/S BACHMANN) APPROVAL AT L1 STATIONNAME OF W ORK:HRSG73 DIVERTER DAMPER BLADE HANGER PIN KEEPER PLATES SUPPLY ANDINSTALLATION WITH OEM (M/S BACHMANN) APPROVAL AT L1 STATION #JEB EL ALIPOWER STATION.PERIOD OF WORK:3 DAYS DURING SHUT DOWN OF HRSG (TENTATIVE DATE FROM 01.04.2024 TO12.04.2024). THE WORK TO BE CAR RIED OUT WITH DAY AND NIGHT SHIFT IFREQUIRED.WARRANTYONE-YEAR WARRANTY IS REQUIRED FOR THIS JOBDIVERTER DAMPER DETAILS,DIVERTER DAMP ER MODEL: - GFD 65BACHMANN NO: - SO-1650DD OEM M/S BACHMANNSCOPE OF WORKTHE OEM (M/S BACHMANN) APPROVED CONTRACTOR SHALL VISIT THE S ITE AND MAKEHIMSELF FULLY FAMILIAR WITH THE WORK SCOPE, PLANT ACCESS, FACILITIES,COMPLEXITIES, SAFETY MEASURES ETC., BEFORE HE SUBMI T HIS BID.TO GET A PTW, HWP CONTRACTOR HAS TO SUBMIT RISK ASSESSMENT FORMS AND OEMAPPROVED METHOD STATEMENT/REPAIR PROCEDURE WITH DR AWING PRIOR TO STARTTHE WORK.MOBILIZE THE LABOR, EQUIPMENT, TOOLS, ETC. WITHIN 24 HRS. AFTER GETTINGTHE CONFIRMATION EMAIL FORM DEWA ENGINEER.THE MOBILIZATION WILL BE AT ONE TIME ONLY.THE CONTRACTOR UPON RECEIVING THE WORK PERMIT, CONFINED SPACE ENTRYSHALL FIRST E NSURE A SAFE WORKING CONDITION BY CHECKING THE LINEISOLATION AND PROPER DEPRESSURIZING OF HYDRAULIC SYSTEM.THE OEM (M/S BACHMANN) AP PROVAL IS REQUIRED FOR SUPPLY OF THE MATERIALAND TO CARRY OUT THE JOB.1- SUPPLY AND INSTALLATION OF THE KEPPER PLATE QUANTITY 4NOS, THICKNESS12.5MM, MATERIAL 316L, THE SIZE OF THE PLATE SHALL BE AS PER OEMRECOMMENDATION.PREPARATION AND SUBMITTAL OF COMPLETE PROCED URE FOR INSTALLATION WITHOEM APPROVAL, INCLUDING THE DRAWINGS, MENTIONING CLEARANCES.MOBILIZATION OF REPAIR CONSUMABLE MATERIAL AND RIGGING TOOLS (TESTED ANDCERTIFIED).WELDING OF THE KEEPER PLATE WITH THE BLADE HANGERS QTY 4 NOS TO AVOIDTHE PINS TO COME OUT.WELDIN G OF THE STIFFENER PLATE WITH DD FRAME QTY 2 NOS TO AVOID THE TOPFRAME SPREADING OUT.CUTTING AND REWELDING OF THE INDICATOR ROD WITH KEEPER PLATE (QTY 1 NO)CHECKING OF OPENING CLOSING OF DD AT BOTH SIDES GT AND HRSG SIDE.ONLY WELL EXPERIENCED MANPOWER TO BE DEPUTE D FOR THIS WORK.THE CONTRACTOR IS RESPONSIBLE FOR ALL WASTE MATERIAL SEGREGATION AND TOKEEP IN THE SAFE LOCATION ASSIGNED.WORK TO BE CARRIED OUT DURING HRSG73 OVERHAUL PERIOD (TENTATIVE DATEFROM 01.04.2024 TO 12.04.2024). THE CONTRACTOR SHALL BE RESPONSIBLE FORANY DELAY IN CARRYING OUT THE WORK.THE OEM (M/S BACHMANN) APPROVAL IS MANDATORY FOR MATERIAL ANDINSTALLATION.PREVIOUS EXPERIENCE PO # T O BE PROVIDED FOR THE SAME TYPE OF JOB FROMDEWA OR ANY OTHER WELL-KNOWN COMPANY.OEM (M/S BACHMANN) APPROVED WORK COMPLETION REPORT, OEM APPROVEDDRAWING, FULL REPAIRING REPORTS WITH PHOTOS & WARRANTY FOR 12 MONTHS TOBE SUBMITTED TO DEWA.MATERIAL TEST CERTIFICATES, WELDER CERTIFICATE, WELDING CONSUMABLECERTIFICATE RIGGING TOOLS CERTIFICATE, WPS, PQR TO BE PROVIDED TO DEWA. DEWA SCOPEFORKLIFT ( IF REQUIRED)SCAFFOLDING.AIR, WATER, AND ELECTRICITY.NDT REQUIREMENT.CONTRACTOR SCOPE OF SUPPLYKEEPER PLATES QTY 4 NOS. THICKNESS 125MM, MATERIAL 316L, THE SIZE OFTHE KEEPER PLATES SHALL BE AS PER OEM RECOMMENDATION.STIFFENER PLATES QTY 2 NOS. THICKNESS 12.5MM, MA TERIAL 316L, THE SIZE OFTHE STIFFENER PLATES SHALL BE AS PER OEM RECOMMENDATION.OEM ASSISTANCE AND APPROVAL FOR THE COMPLETE JOBSKIL LED MANPOWER, TOOLS AND CONSUMABLESALL PERSONAL PROTECTIVE EQUIPMENT.RISK ANALYSIS AND METHOD OF STATEMENT OF THE JOB.DETAILED REPOR T, DRAWING AFTER COMPLETION OF JOB WITH OEM (M/S BACHMANNAPPROVAL).TESTED LIFTING EQUIPMENT WHICHEVER REQUIRED FOR JOB.ALL TOOLS AND TACKLES.WELDER CERTIFICATESWELDING ELECTRODE CERTIFICATESWPS FOR 321 H TO 316L AS PER SITE REQUIREMENT Qty: 4 HRSG73 Diverter Damper Blade Hanger Pin Keeper Plates Supply and Installation with Oem (M/S Bachmann) Approval at l1 Station #Jebel Ali Power Station. contact detail:- Nadeem ANJUM EMAIL NADEEM.AHMAD@DEWA.GOV.AE . 048140678, 0551338462 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://www.dewa.gov.ae/api/RfxDownload/Get/2332400448
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 76979341
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.