Prior Information Notice For Architectural, Construction, Engineering And Inspection Services - 15600 E 0003, Utn, Erschließung, 3. Tbm Parkhaus. The New Technical University Of Nuremberg (Utn) Will Be Located On A Site In The South Of Nuremberg Arise. As Part Of An Innovative, Future-Proof Energy Supply As Part Of The Development Measure (Em1), A Parking Garage With 163 Parking Spaces Will Be Created. For A General Planning Team For Lph 2 To 9 Should Be Commissioned To Implement It. The Services Include: Building Planning (Including Facade Planning), Structural Planning, Technical Equipment Hls And Technical Equipment Excluding Focus Station). On The New Technical University Of Nuremberg Will Be Built On A Site Measuring Approximately 37 Hectares. The 1St Development Stage Includes The Development Measure (Em1) And The 5 Founding Buildings (Ggb), Each Of Which Is Divided Into Several Partial Construction Measures. The Em1 Guarantees The Infrastructural And Supply-Related Functionality Of The Ggb. The 3. Part Of The Development Measure Includes The Construction Of A New Parking Garage With A Total Of 163 Parking Spaces. The Erlangen-Nuremberg State Building Authority Intends To Do So To Commission A General Planner For The Structural Work Of The Parking Garage. Services Are In Particular: Feasibility Study / Test Design, Project Documentation, Functional Service Description With Service Program, Support Of The Award Procedure And Quality Assurance For The Support Of The General Contractor. The Measure Should Be Carried Out A Functional Service Description With A Service Program Is Advertised And Submitted Be Realized By A Total Contractor. With The Current Building Footprint According To The Framework Planning Of Approx. 35M X 50M, The Parking Spaces Could Be Spread Over 3 Floors (Ground Floor 40 Parking Spaces + Main Electrical Station; 1St And 2Nd Floors 60 Each Parking Spaces). According To Requirements, The Parking Garage Must Be Built In Such A Way That It Is In... Could Be Increased In The Next Construction Phase. The Parking Garage Must Be Planned And Constructed In This Way Build A Later Expansion Of A Reasonable Size For Campus Development Is Possible. In This Context, The Planned Measures For Biodiversity (Greening) And Renewable Energy Supply (Photovoltaics) In Their Intended Purpose And Economic Implementation Can Be Evaluated. Because Of The Possible Increase The Pv System Cannot Be Located On The Roof. It Should Have A Designed Facade With Pv And Facade Greening With Ground Connection. Twenty Percent Of The Parking Spaces Should Be Equipped With Electric Charging Points. The Parking Garage Is Through An Access Road With A Barrier System Was Developed Via The New Connecting Road. A Traffic Control System Is Already On Münchner Straße The Availability Of The Existing Signal Parking Spaces. The Approved Project Application Does Not Include Any Areas Of Use (Nuf 1 – 6 According To Din 277), It Is A Parking Garage Including Infrastructure (Medium Voltage Station) For The 1St Ba Of The New Utn Campus. The Planning Of The Focus Station In The Parking Garage Is A Separate Measure.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 75664749
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.