Quotation are invited for G Station Ph-1 FWP Overhaul. OVERHAULING OF PH-1 FWP G STATION # 2024-25PUMP DETAILS:MODEL: WKF- 150 / 3, NO OF STAGES-3SL. NO.: 7-P21-171-569/1~3. 7-P21-171-875 /1~3.FLOW: 360 M3/HR, MIN FLOW: 80.0 M3/HR, TEMP. MAX-120 CDISCHARGE PRESSURE. - 32.2 BAR, SUCTION PRESSURE-3.1 BARRPM-2988, RECOMME NDED MOTOR POWER: 450 KWYEAR OF MANUFACTURE-1992MAKE: KSB.SCOPE OF WORK-VENDOR:1.#MOBILIZATION/DEMOBILIZATION OF PEOPLE AND MATERIAL S. VENDOR NEED TOAPPLY FOR ENTRY PERMIT IN ADVANCE2.#RISK ASSESSMENT AND WORK METHOD STATEMENT TO BE SUBMITTED.3.#TOOLBOX TALK TO BE GIVEN TO THE CONTRACTOR PEOPLE ON DAILY BASIS.4.#PRE DISMANTLING ALIGNMENT READINGS TO BE RECORDED.5.#DISASSEMBLY OF PUMP SUCTION A ND DISCHARGE FLANGE AND PIPELINES.REMOVAL OF AUXILIARY CONNECTIONS/PIPELINES. DECOUPLING OF MOTOR6.#REMOVAL OF THE PUMP FROM ITS POSITION (RIGGING WORK) ANDTRANSPORTING TO VENDOR WORKSHOP7.#ALL THE LIFTING TACKLES AND TOOLS REQUIRED FOR THE WORK TO BEBROUGHT BY VE NDOR AND IT SHALL BE WITH VALID CERTIFICATION.8.#KEEP RECORD/PHOTOGRAPHS OF EACH PART AT THE TIME OF DISMANTLING.9.#GRIT BLASTING OF MAJOR COMPONENTS WITH PROPER MASKING (IFNECESSARY).10.#NDT OF PARTS.11.#RUN OUT PROTOCOL, CLEARANCE PROTOCOL TO BE SUBMITTED12.#SUB MISSION OF DETAILED PHOTOGRAPH, INSPECTION REPORT WITH SPAREPARTS REQUIREMENT.13.#BALANCING OF COMPLETE ROTOR ASSEMBLY/INDIVIDUAL PA RTS TO ISO GRADE.14.#MACHINING/SKIM MACHINE/BUFFING OF WEAR RINGS, IMPELLER WEAR RINGETC. (IF REQUIRED).15.#FIXING OF WEAR RINGS/OTH ER REMOVABLE (WEARABLE) PARTS (IF REQUIRED)16.#STRAITENING OF SHAFT (IF REQUIRED)17.#ASSEMBLY OF PUMP WITH NEW PARTS-PROVIDED BY DEW A BASED ONINSPECTION REPORT.18.#SMALL PARTS LIKE NUT, BOLT, WASHER, O RING, V RINGS, CIRCLIPS ETC.WILL BE IN VENDOR SCOPE IF NOT AVA ILABLE WITH DEWA.19.#PAINT SIMILAR COLOR AS RECEIVED AND BLIND ALL OPENING PROPERLY.20.#PUMP/INDIVIDUAL PARTS TO BE TRANSPORTED TO D EWA WITH PROPERPACKING.21.#ASSEMBLY/FIXING OF THE PUMP IN LOCATION AND CONNECTING DISCHARGEAND SUCTION PIPELINES AND AUXILIARY CONNE CTIONS.22.#COMMISSIONING OF THE PUMP.23.#RETURN THE OLD MATERIAL MATCHING WITH THE SPARES USED.24.#PUMP OVERHAUL SCHEDULE MAY BE IND IVIDUAL/PARALLEL/SERIES25.#DURATION OF WORK 10 DAYS.26.#SUBMISSION OF OVERHAUL REPORT WHICH COMPLY WITH DEWA CHECK LIST.VENDOR#S GEN ERAL RESPONSIBILITY AND LIABILITIES:1.#CONTRACTOR SHALL PROVIDE SUPERVISORY, SKILLED WORK FORCES2.#ONE SUPERVISOR SHOULD BE AT SITE DURING THE WORK.3.#ALL REQUIRED TOOLS, SPECIAL TOOLS & EQUIPMENT ETC. REQUIRED TOCOMPLETE THE JOB WITH VALID CERTIFICATE4.#ALL CONSU MABLES AND ANY OTHER MATERIAL REQUIRED TO COMPLETE THE WORK5.#CONTRACTOR SHALL PROVIDE ALL PERSONAL PROTECTIVE EQUIPMENT, FIRSTAID K IT AVAILABLE AT SITE DURING WORKS.6.#CONTRACTOR SHALL COMPLETE THE WORK WITHIN SPECIFIED DURATION.DURATION WILL BE COUNT FROM SIGNIN G OF PTW TO RETURN OF PTW.7.#CONTRACTOR MUST COMPLETE THE WORK WITHIN THE SCHEDULE PROVIDED BYDEWA EITHER BY INCREASING HIS WORK FOR CE OR BY ROUND THE CLOCK WORK. Qty: 4 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://www.dewa.gov.ae/api/RfxDownload/Get/2332400189
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 75313825
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.