A) Part 1 - Reconstruction Of The Internal Road Ul. Pasternik Plot No. 1045 In Łęg Tarnowski. The Subject Of The Order Includes The Reconstruction Of The Internal Road Ul. Pasternik On Episode From Km 0+000.00 To Km 0+620.28, Reconstruction Of The Gas Network, Protection Of A Section Of The Water Supply Network With A Protective Pipe And Protection Of The Power Cable With A Protective Pipe, Within Which The Following Scope Of Works Will Be Performed: Preparatory Works:• Staking Out Works• As-Built Inventory • Supervision By The Owners Of The Land Infrastructure Network Demolition Works: • Demolition Of Bituminous Surface • Demolition Of Concrete Surface • Loading And Removal Of Rubble Road Earthworks • Excavations Performed Mechanically • Excavations Performed Manually • Embankments • Trenches - Profiling, Cleaning, Desilting Surfaces And Bases• Roadway/Exits• Roadside Surface Made Of Crushed Aggregate • Height Connection Of Exits With Aggregate Traffic Organization• Execution In The Field, Maintenance And Subsequent Demolition Of Traffic Organization At The Construction Site• Target Traffic Organization Water Supply Network• Protection Energy Network • Protection Sanitary Sewage System• Adjustment Of Manhole Covers Reconstruction Of A Section Of The S/C Gas Network Fi90pe 100 Rc Sdr17 Typ2 And Fi63pe 100 Rc Sdr11 Typ2. Moreover, A Detailed Description And Scope Of The Subject Of The Order For Part 1 Are Specified In: Design Documentation - Annex No. 5.1 To Swz, Stwiorb - Annex No. 6.1 To Swz, Bill Of Quantities - Annex No. 4.1 To Swz Designed Provisions Of The Contract - Annex No. 7 To Swz3) The Ordering Party Expects The Contractor To Provide The Price For The Implementation Of Each Part Of The Order For Which It Submits An Offer, As A Lump Sum Price That Covers The Execution Of All Elements Of The Order Being The Subject Of The Drawing And Text Of The Order Documents, Including Vat Applicable On The Date Of Submission Of The Offer.4) Before Signing The Contract With The Selected Contractor, The Ordering Party Requests That He Present A Simplified Offer Cost Estimate, Prepared On The Basis Of The Design Documentation, Bill Of Quantities, Stwiorb And A Possible Vision Local, Carried Out By The Contractor.5) In Addition, As Part Of The Subject Of The Order (Within The Scope Of Each Part Of The Order), The Contractor Is Obliged To Ensure That The Works Are Managed By Persons With Qualifications In The Specialties Necessary For The Proper Performance Of The Entrusted Task And To Keep A Construction Or Investment Log During The Implementation Period (If Required) In Cooperation With The Supervision Inspector Appointed By The Ordering Party, Final Remarks - Regarding All Parts Of The Order: - The Contractor Will Perform Construction Works Based On Graphic Documentation And Bill Of Quantities, In Accordance With The Conditions Of Execution And Acceptance Of Works Specified In Stwiorb, With Due Diligence, In Accordance With Currently Applicable Regulations, Technical Norms, Standards, Principles Of Construction Art, Professional Ethics And The Terms Of The Draft Provisions Of The Contract /Appendix No. 7/, - To Perform The Works, The Contractor Will Use Only Its Own Materials, Having The Required Approvals And Certificates That Will Be Required For Final Acceptance Of The Works. When Selecting Materials, The Requirements Specified In The Technical Documentation And The Technical Specification For The Execution And Acceptance Of The Works Should Be Taken Into Account, - During The Implementation Of The Works, The Contractor Will Remove And Store All Auxiliary Equipment On Its Own And At Its Own Expense, - All Other Costs Of Implementing The Subject Of The Order (Utility Costs – Electricity, Water, Fees, And Others) Necessary To Be Incurred For The Proper Performance Of The Order, Until Its Fault-Free, Protocol Acceptance By The Ordering Party, Will Be Borne By The Contractor. – The Contractor Is Obliged To Exercise Particular Caution And Minimize Any Nuisance Associated With The Work Being Carried Out. The Contractor Will Be Fully Liable For Damages And Consequences Of Accidents Of Employees And Third Parties Arising In Connection With The Construction Works Carried Out In The Period From The Date Of The Protocol Takeover Of The Construction Site By The Contractor To The Date Of Final Acceptance Of The Works - The Contractor Is Responsible For Carefully Reading The Documents Orders. It Is Recommended To Make An On-Site Visit To The Place Of Implementation Of The Subject Of The Order In Order To Estimate, On Your Own Responsibility, The Costs And Risk Of Execution Of The Order And To Obtain All Data That May Be Necessary For The Reliable Preparation Of The Offer, - If The Order Documents Indicate Trademarks, Patents In Relation To Any Materials Or Devices Or Origin, The Ordering Party Allows The Offer Of Equivalent Materials Or Devices With Parameters Not Worse Than Those Described In The Procurement Documents, Which Should Be Treated As Minimum. Due To The Above, Materials Or Devices From Specific Manufacturers Determine The Minimum Quality Parameters And Functional Features That The Materials Or Devices Offered By The Contractor Must Meet In Order To Meet The Requirements Set By The Ordering Party. Such Parameters Will Be Considered As Criteria Used To Assess Equivalence, In Accordance With Article 99 Section 6 Of The Public Procurement Law. Materials Or Devices From Specific Manufacturers Constitute Only A Quality Standard Of The Subject Of The Order. The Term Minimum Quality Parameters And Functional Features Means That The Ordering Party Understands The Requirements For Materials Or Devices Contained In Publicly Available Sources, Catalogs And Manufacturers Websites. The Use Of Exemplary Manufacturers Names Is Only Intended To Clarify The Level Of Expectations Of The Ordering Party In Relation To A Specific Solution. The Use Of Manufacturer/Product Names Is For Example Purposes Only. By Indicating The Designation Of A Specific Manufacturer (Supplier) Or A Specific Product In The Description Of The Subject Of The Order, The Ordering Party Also Allows Equivalent Products With Quality Parameters And Functional Features At Least At The Level Of The Parameters Of The Indicated Product, Thus Accepting Every Product With The Indicated Or Better Parameters. In Such A Situation, The Ordering Party Requires The Submission Of Appropriate Documents Authenticating These Materials Or Devices. – The Ordering Party Reserves The Right To Ask The Author Of The Design Documentation For An Opinion On The Offered Materials Or Devices. This Opinion May Constitute The Basis For The Ordering Party To Decide To Accept Equivalent Materials Or Devices Or To Reject The Offer Due To Lack Of Equivalence - All Requirements Specified In The Procurement Documents Are Minimum Requirements And Their Fulfillment Is Obligatory. Failure To Meet The Above-Mentioned Minimum Requirements Will Result In Rejection Of The Offer As Inconsistent With The Terms Of The Contract Pursuant To Art. 226 Section 1 Point 5 Of The Public Procurement Law.
|