Elaboration Of An Electrical Project For Changing Loads Exceeding 50Kw In Bt, Elaboration Of An Electrical Project For Internal Building Installations., Elaboration Of An Spda Project (Protection System Against Atmospheric Discharges), Elaboration Of An Electrical Project For Solar Energy In A Building., Elaboration Of A Power Exchange Project. Substation With Load Change, Relocation Of Photovoltaic System Of Up To 75 Kwp, Including Disassembly And Assembly In The New Destination Unit Within The Municipal Limits (Urban Or Rural Area)., Construction Of 75 Kva Substation, With A Project Approved By Coelba, According To Daabnt Standards, With Supply And Installation Of Concrete Post, Supply Of Necessary Accessories (Cables, Crosses, Insulators, Screws, Washers, Handles, Hooks, Transformer Support, Lightning Arrester, Fuse Key, 75 Kva Transformer, Saga2000 Measuring Box, Circuit Breakers, Connectors, Grounding Set ), Laying Of Cables And Transportation And Moving Of Material, Construction Of 112.5 Kva Substation, Project Approved By Coelba, According To Abnt Standards, With Supply And Installation Of Concrete Post, Supply Of Necessary Accessories (Cables, Transformer Support, Fuse Key , 112 Transformer, Type Tc Measuring Box, Grounding Set), Cable Laying And Transport And Movement Of Material, Construction Of 225 Kva Substation, 225 Kva Transformer, Construction Of 300 Kva Substation, 300 Kva Transformer, Launch Of Cable And Transport And Movement Of Material., Reconstruction Of 75 Kva Substation For 112 Substation, With Project Approved By Coelba, According To Abnt Standards, Supply And Installation Of Concrete Post, Supply Of Necessary Accessories (Cables, Measuring Box, Type Tc Box, Grounding Set), Laying Of Cables And Transportation And Moving Of Material., Without Supply Of Materials, With Installation Of The Necessary Accessories (Cables, Measuring Box Box Type Tc, Reconstruction Of 75 Kva Substation To 300 Kva Substation, Measuring Box Box Type Tc, Launch Of Cables And Transport And Displacement Of Material., Reconstruction Of Substation With Replacement Of 15 Kva Transformer To 75 Kva (Supplied By The Contractor) With Munck Truck And Project Approved By Coelba, Installation Of Saga Type Aluminum Measuring Board With 125A Circuit Breaker, Copper Cable Connector , 70Mm Copper Cable, Conduits, Transformer Support, Lightning, 35Mm Copper Cable, Miscellaneous And Complementary Services For Demolition, Masonry And Construction Of Masonry Walls.
|