Electrical Installation Work - Kita Kunterbunt And Neighborhood House Kyritz - Lot 420 Electrical Engineering Including Construction Electricity. Renovation Of Kita Kunterbunt And New Construction Of A Neighborhood House: This Is The Building Is A Free-Standing, Solid-Construction Existing Building. The Building Has A Partial Basement. In Addition To An Energy-Efficient Renovation Of The Building Shell Significant Renovation Work Was Carried Out Inside The Building. For This Subject Lot: This House Connection Is In Accordance With The Specified Performance Specifications From The Energy Supplier To Apply. According To Eltbaur, There Will Be A Separate Technical Room In R. -1.03 For The Main Building Distribution Held. The Windows Will Be Equipped With Electric Roller Shutters. The Roller Shutters Should Be Electrically Driven And Controlled In The Respective Room. - The Lights And Lamps Are Part Of The Planning. There Are Motion Detectors In The Hallways, In All Other Rooms The Light Is Turned On And Off With A Switch/Button (Dimmer). Switched Off. -According To Din En 1838, Safety Lighting /3H Is Required For The Building To Plan. The Central Battery System Will Be Located In A Separate Room In The Basement. - Among Other Things The Following Must Be Installed: - It Network, Telephone, Wlan, Dvb-S Antenna Distribution System For Tv, - Telecommunications And Communication Technology Systems, - Hazard Alarm Systems, - Fire Alarm Systems, - Burglar Alarm System, - Burglar Alarm System/Access Control Contents: Ve 420 Electrical Engineering Including Construction Electricity, Construction Preparation Measures, Construction Site Equipment, 1,000 Psch Assembly Scaffolding Up To 4 M, Mobile 96,000 Weeks Assembly Scaffolding Up To 6 M, Mobile 96,000 Weeks Painters Fleece 350,000 M2 Protective Film 500,000 M2 Checking And Disconnecting Circuit. 65,000 Pieces Opening And Closing Existing Sales.. 12,000 Pieces Application For Service Provision.. Energy) From The Responsible Energy Supplier As A Construction Site Power Connection. 1,000 Psch Collection And Installation Of The Measuring Transformers 1,000 Psch Construction Power Connection Cabinet With Measurement 96,000 Wo Grounding For Construction Power Cabinet 3,000 Pcs Earthing Cable 1X25qmm 9,000 M Construction Electricity Crane Distributor 40,000 Wo Group Distributor 96,000 Wo Outdoor Distributor 96,000 Wo Distributor Inside 96,000 Wo Construction Power Cable Extension Cable H07r.. 5,000 Pcs Construction Power Cable Extension Cable H07r.. 5,000 Pieces Of Construction Power Cable Extension Cable H07r.. 10,000 Pieces Of Construction Power Cable Connection Cable H07rn-F .. 10,000 Pieces Dismantling Uv Unlocking 6,000 Pieces Dismantling Interior Lights 120,000 Pieces Dismantling Outdoor Lights 25,000 Pieces Dismantling Up To 10X2x0.8 500,000 M Dismantling Cables/Lines Up To 5X2.5 1,000,000 M Dismantling Cables And Lines Up To 5X10 560,000 M Dismantling Surface-Mounted Installations 39,000 Pcs Dismantling Flush-Mounted Installations 75,000 Pcs Dismantling Sub-Distributions 5,000 Pcs Dismantling Cable Support Systems 100,000 M Dismantling Conduit Holder 125,000 Pieces Dismantling Duct Up To 100X60 56,000 M Dismantling Empty Pipes Flexible And Rigid 35,000 M Dismantling And Storage Lights 35,000 Pieces Low-Voltage Installation System Installation Switch Off/Change Switch 28,000 Pieces Installation Switch Off/Change Switch.. 18,000 Pcs Installation Switches Series Switches 12,000 Pcs Installation Switches Double-Change Switch.. 8,000 Pieces Installation Switch Cross Switch 4,000 Pieces Installation Switch Blind Rocker Switch.. 32,000 Pieces Installation Switches As Rocker Buttons 62,000 Pieces Installation Switches As Double Rocker.. 31,000 Pieces 1-Way Socket Up 268,000 Pcs 2-Way Socket Up 129,000 Pcs Lighting System Luminaire A 234Mm 61,000 Pcs Luminaire B, 316Mm 63,000 Pcs Luminaire C, 445Mm 48,000 Pieces Light D, Hallway 51,000 Pieces Light E, Hallway 16,000 Pieces Light F, Outside 1 T9 Pw30 58,000 Pieces Lamp G, Outside 2 T21 18,000 Pieces Lamp H, Outside 3 T9 13,000 Pieces Telecommunications And Information Technology. Systems 19 Floor-Standing Housing, 42 U 1,000 19 Wall Housing, 21 U 1,000 Pcs Patch Panel Cat6[A] 6,000 Pcs Cabling Cat 7 3,200,000 M Hang Up Cat 7 138,000 Pcs Central 1,000 Pcs Concept Of The Bma 1,000 Pcs E/I30 Housing 1,000 Pcs Fire Brigade Key Box Installation 1,000 Pcs Fire Brigade Information And Operating System 1,000 Pieces Central Unit 3,000 Pieces Manual Alarm 9,000 Pieces Ventilation Buttons 3,000 Pieces Of Safety Lighting Battery System 1,000 Pieces Of Rz Light, Cable Assembly 1,000 Pcs Rz Luminaire, Ceiling Installation 1,000 Pcs Rz Luminaire, Ceiling Surface Mounting 4,000 Pcs Rz Luminaire Wall-Mounted 47,000 Pieces Sl Lamp Ceiling-Mounted Symmetrical .. 41,000 Pieces Sl Lamp, Ceiling Structure With Symmetrical.. 28,000 Pieces Sl Light 5Lx 14,000 Pieces Beh.-Emergency Call Compact Set Toilet + Group Light 2,000 Pieces Additional Parallel Display 2,000 Pieces Additional Pull Button 2,000 Pieces Ups 230V, 325Va 2,000 Pieces Cabling 2,000 Pieces Sun Protection Control Panel And Sun Protection Control Unit 2-K.. 1,000 Pieces Ap Housing For Sun Protection Control Unit 1,000 Pcs Weather Station Multisense 1,000 Pcs Connecting Cable Weather Station 4Xawg .. 1,000 Pcs Wind/Photo Sensor (1 Facade).. Cable 2,000 Pcs Steel Standpipe 1,000 Pcs Angle Bracket Aluminum 3,000 Pcs Mse Kompakt 2 Surface-Mounted 2,000 Pcs Revision And Acceptance Inspection Documents For Heavy Current 1,000 Psch Acceptance And Instruction For Heavy Current 1,000 Psch Participation Of Expert Acceptance 1,000 Psch
|