Engineering Services - Investigation And Evaluation Of Development Goals For The Pisselsmühle Pre-Dam. The Thuringian Long-Distance Water Supply Intends To Build A Dam As Part Of The Overall Project Weida – General Repairs Of Barrier Structures And Ancillary Facilities, Planning Services For The Pisselsmühle Pre-Dam (Sub-Object 2). The Weida Dam Is In Continuous Operation Since 1955. During This More Than 65 Year Operation So Far, Only Smaller, Congestion-Independent, Building-Preserving Renovations And Upgrades Have Been Carried Out Been Carried Out. All Structures, Facilities And Equipment Show Strong Progressive Signs Of Wear And Tear Caused By Aging And Use. The Bridge Structure Received A Condition Score Of 3.1 In The Last Test Report From 2015, So It Is An Inadequate Structural Condition Is Certified. Traffic Is Currently On One Lane Limited By Narrowing. As Part Of The Study By Pöyry Deutschland Gmbh From 2014 (“Study Pöyry”) The Technical And Economic Possibilities As Well As The Effects • Of Repairs Including Continued Operation Or Dismantling The Preliminary Barrier And • A Dismantling Or Repair Or A New Building The Road Bridge Including Abutments (Preservation Of The Road Connection) At The Pre-Barrier Pisselsmühle Is Examined As A Basis For Decision-Making For Further Action. On Basis The “Study Of Pöyry” And In Continuation Of The Planning Activities For The Repair The Main Dam And Saddle Wall And The Additional Knowledge Gained Thereby A Justifiable Decision To Maintain Or Dismantle The Pisselsmühle Pre-Dam Not Derive. There Are 3 Preselected Variants From The “Pöyry Study” And An Additional Sub-Variant Through Further Information And Investigations Consider.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 72636420
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.