Quotation Are Invited For Cccw Cooler 1 Overhauling And Testing At K Station. Technical And General Specification Of Work At K Stn, Jebel Ali Power Station Tiltle: Cccw Cooler Servicing And Testing At K Phase Ii Quantity : 1 No Duration : 5 Days Scope Of Work Removal Of Cccw And Inspection Disassemble The Cccw Cooler And Remove All Th E Heat Transfer Plates, Transporting To The Supplier Work Shop, And Inspection. Inspection Report Will Be Submitted, Detailing The C Ondition Of The Gaskets And The Plates. Debonding Of Gaskets All The Gaskets Will Be Removed From The Plates By Lowering The Plates Into A Bath Of Liquid Nitrogen. This Is The Safest Method Of Gasket Removal As It Avoids Any Stresses On The Plates Which Could Hap Pen With Other Traditional Methods Using A Hot Gun Etc As Per Oem. Party Can For Alternate Approved Method. Plate Cleaning The Plat Es Shall Be Cleaned Either By Chemical Cleaning Or Hydro Blasting, Depending On The Nature And Type Of Scale. Cleaning The Plates Us Ing Specially Formulated Acids And Alkalis To Safely Clean The Plates Without Causing Any Damage To The Plates. Various Acids And Al Kalis Are Used To Chemically Clean All Deposits From The Plate And Gasket Groove. The Exact Selection Of Chemicals, Combination And Procedure Will Only Be Determined After Receiving The Plates And Examining The Fouling On The Plates. Maxim Care To Be Given To Avoi D Any Damage Of The Plates Visual / Gasket Groove Inspection All Plates Will Be Inspected Visually For The Effectiveness Of Cleani Ng, Any Deformations, Corrosion Or Visual Cracks. Gasket Groove Deformations Shall Be Measured Using Specific Measuring Instruments / Tools. The Same Shall Be Evaluated With Respect To The Permissible Level Of Deformations When Compared To The Original Groove Dime Nsion, Repair Gasket Grooves If Required Liquid Penetrant Inspection Lpi To Check For Any Cracks And Pinholes (Defects) On The Pla Tes. Inspection Test Plan Shall Be Submitted By The Party Regasketting Fresh Alfa Laval Gaskets Are Bonded To The Plates By The Us E Of Unique 2-Part Epoxy Resin Cement, Which Requires High Temperature Curing Or Any Approved Method. Gaskets To Be Purchased And Su Pplied By Supplier. Dewa Will Not Provide Gasket And Any Kind Of Consumables Oven Curing All The Plates Will Be Glued Gaskets Shal L Be Oven Cured. Qty: 1 Cccw Cooler 1 Overhauling And Testing At K Station Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332302462
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 72018688
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.