Providing Fountains, Architectural Items, Cc Bollards, Art Installations, Street Furniture Etc From Krishna Circle To Devuni Kadapa Junction In Kadapa Town, Ysr District Under The Main Work Of Widening And Strengthening Of Road From Krishna Theater To Devuni Kadapa Road Via Market Yard From Km 0 / 0 To 2 / 2-1 92.80 Earthwork Excavation In Soils Upto Sdr By Mechanical Means For Foundations Of Structures As Per Drawing And Technical Specification Including Setting Out, Construction Of Shoring And Bracing, Removal Of Stumps And Other Deleterious Matter, Dressing Sides Of Bottom, Back Filling The Excavation Earth To The Extent Required Etc., Complete For Finished Item Of Work, Excluding Seigniorage Charges, As Per Mort&H Specification 304 ( 5Th Revision ) And As Directed By The Engineer-In-Charge 2 23.20 Plain Cement Concrete ( 1:4:8 ) ( Cement: Fine Aggregate: Coarse Aggregate ) For Foundations And Under Flooring Bed Using Coarse Aggregate 40Mm Size Hard, Machine Crushed Granite From Approved Quarry Including Cost And Conveyance Of All Materials Like Cement, Sand, Coarse Aggregate, Water Etc. To Site, Including Sales & Other Taxes On All Materials And Including All Charges For Machine Mixing, Laying Concrete In Foundations And Under Flooring Bed, Ramming In 15 Cm Layers Finishing Top Surface To The Required Level Curing Etc., And Overheads & Contractors Profit Complete For Finished Item Of Work. ( Apss No. 402 ) 3 144.15 Solid Fly-Ash Block Masonry 225 Mm Thick For Panel Walls In Super Structure, Parapet Walls With Cement Mortar ( 1:6 ) Prop ( Cement:Sand ) Using Solid Fly-Ash Blocks Of Size 290 X 225 X 140 Mm For Manufacturing Of Flyash Solid Blocks From Approved Source Having Minimum Crushing Strength Of 5 N / Sq.Mm. Including Cost And Conveyance Of All Materials Like Cement, Sand, Bricks, Water Etc., To Site, Cost Of Excluding Seigniorage On All Materials And All Incidental And Operational, Labour Charges Like Mixing Cement Mortar, Scaffolding Charges, Constructing Masonry, Lift Charges, Curing Etc., Complete For Finished Item Of Work As Per Ss 504. For:-Fly Ash Block Masonry In Cm 1:6 ( 290X225x140 ) 4 626.72 Plastering 20 Mm Thick In Two Coats With Base Coat Of 16 Mm Thick In Cm ( 1:6 ) And Top Coat Of 4Mm Thick In Cm ( 1:4 ) With Dubara Sponge Finishing Including Cost And Conveyance Of All Materials Like Cement, Sand, Water Etc., To Site, Excluding Seigniorage Charges, Sales & Other Taxes On All Materials, And All Operational, Incidental Charges On Materials And Including Cost Of All Labour Charges For Mixing Mortar, Finishing, Scaffolding, Lift Charges, Curing, Including Cutting Grooves As Directed By Engineer - In - Charge Etc., Complete For External & Uneven Surfaces Of Brick Wall And Rcc Exposed Surfaces For Finished Item Of Work. ( Ss 901, 903 & 904 ) For:-Plastering 2 / C In Cm ( 1:4 ) & ( 1:6 ) : 20 Mm 5 626.72 Providing Cladding To Internal Walls / Skirting To Internal Walls To 15 Cm Height With 8Mm Thick Mirror Polished Granite Tiles, Set Over Base Coat Of Cm ( 1:5 ) 12 Mm Thick Using Screened Sand With Cement Slurry Of Honey Like Consistency Spread At The Rate Of 3.30 Kgs Per Sqm And Jointing With White Cement Paste Mixed With Pigment Of Matching Shade To Full Depth, Including Cost Of All Materials Like Tiles, Cement, Sand And Water Etc., And Overheads & Contractors Profit Complete Etc., Complete For Finished Item Of Work. ( Apss No.701 &707 ) 6 28000.00 Manufacture, Supply, Delivery And Fixing Of Mild Steel Tubes & Pipes Of All Diameters As Per Is-1161 For Seating Like Ms Hallow Sections Etc, Made With Ms Structural Steel, I.E. Circular, Square Hallow Sections Etc Including Welding , Finishing Etc Complete Unit 1.00 Kgs. ( 3Parts Of Seating ) 7 404.00 Painting To New Iron Works With 2 Coats Of Synthetic Enamel Paint Of Approved Brand And Over 1 Coat Of Red Oxide Primer Of Approved Brand To Give An Even Shade After Thoroughly Cleaning And Sand Papering The Surface To Remove All Dirt And Remains , Including Cost And Conveyance Of All Materials To Work Site And All Operational, Incidental, Labour Charges Etc. Complete For Finished Item Of Work For:-Painting To Iron Work - Synthetic Enamel Paint To New Iron Work - 2 Coats + 1 Coat Iron Primer 8 8.00 Supply Fabrication And Installantion Of U4 Umbrella Urban Decorative Seater. The Top Design Shall Have 6Nos Squre Frustum Of 300Mm, Each Frustrum Shall Have Alu / Ss Spokes Connecting To Middle Pole, The Middle Pole Is Collection Of 25 / 32Mm Ms Pipe Innterconnecting The Umbrella Spokes, Middle Pole Of 2000Mm Height. The Seater Shall Be Octahedron Shape Of 600*450Mm* 5 Seater. The Seater Are Made Of Ms Internal Frame With Alu Cover And Polywood Seatting. An Led Linear Tube Is Run On The Top For Ambient Lighting Rated Wattage: 36Watt, Ip65, 3000K. Body Color: Multicolor Pu Paint As Per The Deisgn Attached Including Transportation To Site. 9 3000.00 Supply And Fixing Of Cc Bollards Of M30 Grade Of 150Mm Dia And 950Mm Height, Excavate The Pit Of 0.25X0.25X0.40M, Laid A Bed Concrete With Pcc 0.20X0.20X0.1M And Remaining Pit Filled With Vcc Of 0.2X0.2X0.25M With Labour Including Cost Of All Materials Like Cement, Sand, Water Etc. And All Operational & Incidental Charges Etc., Complete For Finished Item Of Work Including Transportation To Site 10 80.00 Suppying And Fixing Dustbins Pole Mounted Twin Ss Bin With Roof, Material :Ss 202 Grade, Capacity:60Ltrs X 2 Bins, Weight : 20 Kgs Including Transportation To Site ( Ambedkar Circle, Kadapa Town, Ysr District ) Complete For Finished Item Of Work Including Transportation To Site 11 30.00 Supply And Installation Of 9W Led Spike Light, Housing Made Of Die Cast Aluminium, Ip65, Ik06, Electrical Class -I, P.F >0.9, Body Colour: Grey.Cat.Ref: Lm Castor 9W Ww Complete For Finished Item Of Work Including Transportation To Site 12 2.00 Supply And Fixing Of Led Moving Message Display Board ( Vms ) - Single Colour Of Full Colour Modules As Per En-12699:2014 , Fixed Structure , Rs232 / 3G Communication To Control Room ( Optional ) With Labour Including Cost Of All Operational & Incidental Charges Etc. Complete For Finished Item Of Work
|