Quotation Are Invited For Third Party Inspection Of Whrb 11,12,21,22,31 At G Station. Third Party Inspection Of Whrb 11,12,21,22,31 At #G# Station As Per Eiac-Rq-Ib-004 (Formerly Dac-Req-08) Scope Of Work For Inspecti On According To Eiac-Rq-Ib-004 (Dac Req-08): 1.1: Pre Outage Inspection: A.#Review Of Manufacturer#S Certification For The Boiler And Identification Based On Manufacturer#S Markings/Asme/Ce Markings. B.#Review Of Records For Site Erection And Final Examination Results/Repair/Alteration Records. C.#Visual Examination On All Accessible Area. D.#Review And Verify Thermography Reports E.#Extern Al Visual Examination On All Accessible Area. F.#Walk Down And Punch List Reports Based On Findings And Interviews G.#Recommendation For Nde Tasks To Be Performed During Inspections H.#Review Of Last Inspection Report I.#Review Of Latest Operating Data From Contro L System Historian And Other Available Archives J.#Inspection For Vibration Of Pipe, Headers, Steel Structure, Etc. 1.2: Outage Ins Pection: A.#A Visual Survey Of The Hrsgs General Condition, External Casing, Internal Gas Side Mechanical Parts And Auxiliary Equip Ment Readily Accessible Pressure Parts Etc B.#The Internal Thorough Inspection Constitutes A Visual Examination / Survey Of The Acce Ssible Surface Of The Boiler Pressure Parts, The Tubes Headers, Accessible Supporting Arrangements, Refractory Lining, Drums, And Th E Internal Fittings In Order To Detect Any Sign Of General Or Localized Deformation/Deterioration. Where Applicable Or Necessary, No N-Destructive Testing Methods, Destructive Testing Of Samples, In-Situ Metallography Etc Shall Be Used To Complement The Visual Insp Ection. C.#External Visual Examination Carried Out On All Accessible Area. D.#Visual Inspection And Witness Of Ut Thickness Measurem Ent Of High, Medium And Low Pressure Steam Piping And Headers E.#Visual Inspection And Witness Of Ut Thickness Measurement Of Pressu Re Vessels And Piping Systems F.#Review Of Thickness Measurement Records To Verify Whether The Current Thickness Is Not Less Than Th E Minimum Allowable Wall Thickness G.#Review All Critical Steam-Piping Hangers By Checking The Indicator Of Hot Position & Adjust If Necessary H.#Visual Inspection / Survey Of Burners, Air Registers And Dampers I.#Inspect Main Stack & Its Accessories For Any Discr Epancy J.#Based On Visual Inspection And Previous Record Review, The Inspector May Identify Additional Nde (Thickness Measurement, M T, Pt, Hardness Etc.,), The Nde Results Will Be Reviewed Compliance To Drawings, Code And Specification If Available Or Retained For Future Reference. K.#All Abnormal Conditions Such As Poor Coating, Rusted/Corroded/Pitted Surface, Rusted Bolts / Nuts, Loose Bolte D Assemblies, Rusted Weld Seams, Cracks, Distortion, Bends, Dents, Sagging, Bulging Items, Indication Of Leak, Indication Of Water I Ngress, Piping/Tube Excessive Vibrations, Wastage Reduction Of Pressure Retaining Thickness Shall Be Reported. 1.3 Post Outage Insp Ection: A.#Review Of Inspection Report And Records For Repair If Any Performed. B.#Witness Of Hydro Test As Applicable C. Qty: 1 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332302307
|