|
Technical Assistance Service And Support To The Construction Management For The Control And Surveillance Of The Works Corresponding To The “Project For The Modernization Of The Irrigation Infrastructures Of Sectors Xii And Huesca).. The Project, Approved By Resolution Of May 26, 2023, Of The General Directorate Of Rural Development, Innovation And Agri-Food Training Of The Ministry Of Agriculture, Fisheries And Food, Includes The Execution Of The Following Works: Current Intake In Canal De Monegros From The That The Water Will Be Diverted To The M-47 Ditch And, From This, To The Newly Built Canal Foot Pond. Canal Foot Pond, Bp2, With An Approximate Volume Of 388,000 M3 And With A Namo Elevation Of 382.50 Meters Above Sea Level, From Which The Irrigation Network On Floor 2 Is Supplied By Gravity, For An Area Of 860.12 Ha. Intermediate Basin, Bp1, With An Approximate Volume Of 91,500 M3 And With A Namo Elevation Of 344.00 Meters Above Sea Level, From Which It Is Supplied By Gravity Irrigation Network Floor 1, Which Includes The San Juan Network Dominated By The Existing San Juan Reservoir That Is Supplied From The Bp1 Pond, For An Area Of 1246.48 Ha. Connection Pipe Between Pond At The Foot Of The Canal (Bp2) And Intermediate Basin (Bp1) For Turbine Admission. Elevated Basin, Bp3, With An Approximate Volume Of 93,000 M3 And With A Namo Elevation Of 418.00 Meters Above Sea Level, From Which The Area Not Dominated By Natural Pressure Is Supplied, I.E. , Around 666.66 Ha, Which Will Be Structured In Two Floors, Floor 3 And Floor 4. From This Pond, The Dominated Area In Which The Pressures Available Allow For Sprinkler Irrigation. This Area Will Be Called Floor 3. Repumping With The Contribution Of Conventional Electrical Energy For The Dominated Area In Which The Pressures Are Insufficient For Sprinkler Irrigation, This Network Will Be Called Floor 4. Planned Power, 44 Kw, Supplied From The Network Conventional Electrical System. Turbine-Pump System With Mechanical Coupling, Located Next To Basin Bp1, To Raise All The Water From Floors 3 And 4, Taking Advantage Of The Available Energy Due To The Difference In Level Between Basins Bp2 And Bp1, And The Flow To Be Diverted To The Pond Bp1, Water Consumed By The Irrigation Network On Floor 1. Turbine Performance Considered, 90% (Limiting To Some Turbine Installers). The Total Installed Power Will Be 274 Kw (2X137) For The Pump To Be Coupled To The Pump Turbine, And 295 Kw (2X148) For The Turbine. Impulsion-Distribution Pipe To Bp3 And, To The Irrigation Network Of Floor 3 And Re-Pumping To Floor 4.Irrigation Networks.Tertiary Network (Up To Plot), Which Will Have A Length Of About 8.76 Km.Telecontrol.Low Electrical Installations.Medium Voltage Electrical Installations.
|