Ögp Md-Rothensee: Spundwand Zweigkanal. In The Course Of The Contamination Protection Of A Former Gas Plant In Magdeburg, A Sheet Pile Wall Is To Be Installed In The Third Construction Phase. The Main Construction Work To Be Carried Out Has The Following Characteristics: Sheet Piling Total Length Around 200 M Double Planks With Interlock Seals And Interlock Crack Detectors, Around 19 25 M Plank Length Installation On The Water Side Over A Length Of Around 188 M With An Anchoring Depth Of Around 9 15 M In The Subsoil Landside Installation Over A Length Of Around 12 M With An Anchorage Depth Of Around 25 M In The Subsoil Rear Anchoring Using Ground Anchors Loosening Bore In The Area Of The Locks Backfilling Of The Upstream Sheet Piling According To Eau5.4 Before The Start Of The Sheet Piling Work, A Preliminary Investigation For Explosive Ordnance Clearance Must Be Carried Out In The Axis Of The Sheet Piling Route And The Anchor Position. The Construction Work Is To Be Accompanied By Vibration Measurements.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 68743460
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.