The Subject Of The Contract Is Modernization Of The Village Hall In Osówka, Commune Lubowidz, Plot No. 333. General Characteristics Of The Building The Subject Of The Order Is A One-Story Brick Building Covered With Sheet Metal. Finishing Installation, Plastering And Insulation Works Will Be Carried Out In The Building. Dimensions Of The Building. Overall Dimensions Of The Building: 7X5 M. Building Area 35 M2. Usable Area 27.16 M2. Height 5.2 M. Demolition Works - Cutting Out Windows And Window Sills From The Wall In The Existing Part, - Demolition Of The Wall In The Existing Part Below The Window Opening, - Enlarging The Opening To The Bathroom For The Disabled In The Partition Wall, - Removal And Disposal Of Rubble, 2. Masonry Works - Bricking Up Part Of The Window Opening, 3. Roofing. - Disassembly Of Downpipes For Façade Works And Their Reassembly (Including New Pipe Holders), - Execution Of Eaves Soffit.4. Plasters And Internal Linings. - Execution Of Internal Cement-Lime Plasters, Category Iii On Walls And Bricked-Up Openings And Jambs, 3- Execution Of Suspended Ceilings Made Of Waterproof Plasterboards. - Execution Of Suspended Ceilings Made Of Fire-Resistant Plasterboards Ensuring Ei60 Class. Thermal Insulation Of Mineral Wool Ceilings Gr. 16 Cm, - Execution Of Vapour-Proof And Vapour-Permeable Insulation Of Ceilings, - Execution Of Wall Linings Made Of Ceramic Tiles (Glaze) In Bathrooms And A Glazed Screen At The Sink In The Boiler Room, 5. Window And Door Joinery. - Delivery And Assembly Of Pvc Window Joinery In The New Part And Windows In A Partly Bricked-Up Opening In The Old Part, - Delivery And Assembly Of Pvc Window Sills, - Delivery And Assembly Of Single-Leaf Aluminum Entrance Doors Glazed With Safety Glass With A Clear Width Of Min. 90 Cm, - Delivery And Assembly Of Double-Leaf Aluminum Doors (One Leaf At Least 90 Cm Wide In The Clear) With A Transom, Glazed With Safety Glass, Transitions From The Old To The New Part. - Delivery And Assembly Of Door Frames And Internal Door Leaves (Door To The Bathroom For The Disabled, Width 90 Cm In The Light Of The Frame). - Separating Toilet Cabins From Hpl With Doors And A Wall At The Urinal, 6. Substrates For Floors And Floors. - Execution Of Layers Of Subfloors For Floors In Rooms, - Execution Of Floors Made Of Gres Tiles With Plinths.7. Painting Works. - Internal Gypsum Plaster On The Walls, - Two Coats Of Wall And Ceiling Surfaces With Emulsion Paints (Colors To Be Agreed With The Investor).8. Elevation And External Elements. - Thermal Insulation Of External Walls With A Light Wet System, - Execution Of External Window Sills Made Of Coated Steel Sheet, - Execution Of A Band Around The Building Made Of Concrete Paving Stones, - Hardening Of The Area Next To The Building, - Execution Of External Stairs, - Covering The Stairs With Frost-Resistant Anti-Slip Ceramic Tiles .9. Electrical Installations. - Execution Of The Electrical Installation In The Building (Sockets, Lighting Fixtures, Switches, Etc.). - Delivery And Assembly Of The Electrical Switchboard And Fire Protection Switch10. Sanitary Installations.10.1. Central Heating Installation, - Delivery And Assembly Of Central Heating System Pipelines Together With Manifolds And A Cabinet, - Delivery And Installation Of Central Heating Radiators Together With Thermostatic And Return Valves, - Tests And Adjustment Of The Central Heating System, - Connection Of The Underfloor Heating System In The Old Building To The New Boiler Room, Including Pipe Casing, 10.2. Water And Sanitary Installation. - Execution Of Water And Sewage Systems In Bathrooms And Boiler Rooms, - Delivery And Assembly Of Sanitary Equipment, - Delivery And Assembly Of Flow-Through Water Heaters Under The Washbasin, - Connection Of The Water System In The Old Building.10.3. Ventilation Installation - Connection Of Bathroom Ventilation To Ventilation Chimneys, 10.4. Water Supply Connection. - Execution Of A Water Supply Connection From Pehd Pipes With The Installation Of Drills, Ball Valves, Water Meter, Anti-Pollution Valve, - Flushing, Disinfection And Water Testing. 10.5. Sanitary Sewage Connection. - Making A Sanitary Sewage Connection From Pvc Pipes Fi 150 With Delivery And Assembly Of A Prefabricated Sealed Tank, 10.6. Boiler Room Technology - Disassembly Of The Central Heating Boiler In The Existing Boiler Room, - Installation Of The Central Heating Boiler In A New Boiler Room (Boiler From Disassembly), - Assembly Of Complete Boiler Room Accessories (Pipes, Fittings, Pump, Valves, Etc.). 100 Sec. 1 Of The Act. A Detailed Description Of The Subject Of The Contract Is Included In: Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Bill Of Quantities Attached To The Swz. The Scope Of All Construction Works Covered By The Order Is Indicated In The Bill Of Quantities. The Order Is Co-Financed From The Mazowieckie Voivodeships Own Budget As Part Of The Support Program Mazowsze For Local Integration Centers 2023.
|