Planning Services For The Laying Of A District Heating Booster Line Ostspange Dn 300. Nergie Netz Gmbh Is Planning To Connect The Existing District Heating Line (Kmr Pipe Dn 200) In Kressengartenstrasse, Near The Shore Of Wörther See, And The Existing Line In Bauvereinstrasse (Kmr Pipe Dn 300) In Nuremberg. Closing The Gap, The So-Called East Span, Serves To Significantly Increase The Performance Of The District Heating Network. A Body Of Water, The Lake Wörther See Has To Be Crossed On The Planned Route. The Crossing Of The Wörther See Over A Length Of Approx. 200 M Is To Be Created By Means Of A Pipe Jacking Including Two Connecting Shaft Structures. The Planned Jacking Pipe Crosses Lake Wörth In The Direction Of Jacking. The Culvert Required For This Must Be Designed So That It Can Be Walked On And Piped With Two Dn 300 Fw Pipes. The Entire Route In Kmr Dn 300 Is Approx. 630 M. This Order Includes The Planning Services According To Hoai (Services For Engineering Structures, Structural Engineering, Technical Equipment).
Contact Information
Address
Sandreuthstr. 21
Contact No.
+49 91180258411
Email
marion.wirth@n-ergie.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 66326751
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.