As Part Of The Implementation Of The Subject Of The Contract, The Following Works Are To Be Performed: A) Room - 14 In Building B • Demolition Of A Fragment Of A Brick Partition Wall, • Demolition Of Plasterboard Partition Walls, • Disassembly Of A Suspended Plasterboard Ceiling (In Preparation Room), • Chipping Off The Floor Tiles (Outside The Toilet Room), • Leveling The Floor And Making A Self-Leveling Screed For The Pvc Lining, • Finishing The Floors (Except The Toilet) With A Pvc Lining With Rounded Plinths, • Chipping The Wall Tiles Up To 220 Cm High (Outside The Toilets), • In The Room Toilets Painting Wall Tiles With Glaze Paint, • Assembly Of Plasterboard Walls, • Assembly Of Door Joinery And A Glass Wall In Partition Walls, • Disassembly Of Equipment - Furniture, Kitchen Furniture With Fittings And Equipment, • Replacement Of Lighting Fixtures With Fluorescent Lamps For Led Lamps, • Removal Of Wallpaper From Reinforced Concrete Elements: Columns And Binders, And From The Frames Of Wall Niches, • Connecting A Ventilation Duct From A Spiro Pipe To The Existing Mechanical Exhaust Ventilation System Through A Stub For Flat Ducts, • Making A Ventilation Opening In The Existing Mechanical Ventilation Duct, • Assembly Of Furniture Equipment Together With B) Rooms 212, 213, 214 In The Aworks Building Include All Activities Enabling And Aimed At Performing Construction Works, Electrical Installations, Computer Networks And An Internal Power Line From The Modernized Tz-2 Switching Station In The School Building. The Scope Of Works Includes: • Demolition Works, • Flooring Works, • Gk Construction Works, • Ceiling Construction Works, • Painting Works. 2 In The School Building. The Scope Of Works Includes: - Wlz Electrical Installation, - Assembly Of The Tz-2 Switchgear With Equipment, - Assembly Of The Tz-214 Switchgear With Equipment, - Assembly Of The Distribution Cabinet, - Installation In The Buildings Rooms - Lighting Installation, - Electrical Installation Of Plug Sockets, - Transmission Installation Video Signal, - Lan Teletechnical Installation, - Installation Of Equipotential Bonding, - Installation Of Fuse Switchboards With Equipment, - Scene Control Installation (Room 214), - Measurement Works - Preparation Of As-Built Documentation
|