1. The Subject Of The Contract Is: Construction Of The Poviat Road Brzeźno - Pokrzywnica Together With A New Bridge Over The Orza River. Road Industry1. Reconstruction Of The Route And Elevation Points In The Plain Area2. Removal Of A Layer Of Fertile Soil (Humus) 3. Removal Of Trees 4. Demolition Works 5. Earthworks 6. Making Embankments7. Drainage Of The Road Body8. Foundations 9. Pavements10. Finishing Works 11. Road Markings And Traffic Safety Devices12. Setting Up Protective Barriers 13. Other Works B. Bridge Industry 1. Development Of A Traffic Organization Design, Assembly And Disassembly Of Markings And Securing Works For The Duration Of The Construction Of The Bridge And Access Roads2. Reconstruction Of The Route And Elevation Points In The Plain Area3. Mechanical Removal Of The Layer Of Fertile Soil 4. Disassembly Of Rigid Protective Railings With Loading And Transport5. Demolition Of Bridge Structures With Loading And Transport6. Disassembly Of Steel Elements Of The Bridge7. Excavations In Non-Jointed Soil With Reinforcement 8. Backfilling Of Excavations With Compaction9. Execution Of Sheet Piling Made Of Steel Sheet Piles 10. Driving Reinforced Concrete Piles11. Concrete Reinforcement With Steel A Iii12. Concrete Foundations Class C25/30 W8 F150 In Formwork13. Concrete Of Supports Class C25/30 W8 F150 In Elements >60 Cm Thick14. Concrete Of The Load-Bearing Structure Of Class C@%/30 W8 F150 In Elements <60 Cm Thick15. Class C16/20 Concrete In Formwork16. Assembly Of Prestressed Concrete Elements, Type Kujan, Weighing 13.4 T17. Execution Of Insulation From Heat-Weldable Roofing Felt18. Cold Applied Bitumen Insulations19. Bridge Drains20. Plastic Drain Pipes21. Sączki22. Elastomeric Bearings23. Tight Expansion Joints24. Stone Bridge Curb25. Protective Barriers On Bridges 26. Steel Railings On Bridges 27. Laying Casing Pipes In Pavements28. Drilling Holes And Assembly Of Bonding Anchors 29. Resin Pavements On Bridges 30. Mechanical Cleaning Of Structural Layers31. Sprinkling Structural Layers With Asphalt Emulsion32. Execution Of Asphalt Concrete Pavement Ac 16W 50/70 - Binding Layer33. Execution Of Asphalt Concrete Pavement Ac 11S 50/70 - Wearing Course34. Topsoiling With Sowing Of Slopes 35. Strengthening Of Slopes With Cobblestones On A Ballast36. Implementation Of The Rip-Rap37. Installation Of Single-Sided Steel Protective Barriers 38. Installation Of Concrete Edges 39. Construction Of Stairs On The Slope With Handrails Protected Against Corrosion C. Sanitary Industry1. Construction Of A Pressed Sanitary Sewer2. Construction Of Rainwater Drainage D. Technology Industry1. Construction Of Cable Wells 2. Construction Of Service Duct3. Additional Works. Note! All Demolition Materials Are The Property Of The Employer. Reusable Concrete Elements Should Be Transported To The Odm Base In Ostrołęka, Ul. Słoneczna 1, 07-410 Ostrołęka. The Costs Related To The Storage, Loading, Transport And Unloading Of These Materials Shall Be Borne By The Contractor.2. A Detailed Description Of The Implementation Of The Subject Of The Contract Is Included In The Technical Documentation, Bills Of Quantities And Technical Specifications For The Execution And Acceptance Of Works, Which Are Annexes To This Tor.
Contact Information
Address
Zarzad Dróg Powiatowych W Ostrołęce,Ostrołęka,07-410,Mazowieckie,Pl924 - Ostrołęcki
Contact No.
+48 29 769 49 20
Email
zdpo-ka@wp.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 60063086
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.