Quotation Are Invited For Design, Supply, Installation And Testing Of Diesel Engine Cooling Line Drain Piping To Fire Water Tank At Hrsr 400Kv Substations. Design, Supply, Installation And Testing Of Diesel Engine Cooling Line Drain Piping To Fire Water Tank At Hrsr 400Kv Substations. S Cope Of Work: 1.#Visit The Site To Acquaint Himself Fully To Assess The Requirement. 2.#Design, Supply, Installation And Testing Of Diesel Engine Cooling Line Drain Piping Extension From Existing Drain Point Inside The Fire Pump Room To Fire Water Tank 3.#Design ( Single Line Diagram Only) The Piping Extension From The Available De Cooling Line Drain Piping Inside Fire Pump Room To Fire Water T Ank. 4.#Hydraulic Calculation For The Extension Work To Be Submitted For Approval. 5.#The Pipe Size Selection Should Be Up Size Than The Existing Cooling Loop And Should Ensure Minimum Flow Rate As Follows: Substation Name# Make # Model # Speed # Power # Engine Water Jack Et Temp Normal Range #Heat Exchanger Min Flow# Hrsr 400 Kv#Clarke#Jw6h-Uf60#1760 Rpm#360 Bhp#82-91 Deg C#155 L/Min# Note: Actual Heat Exchanger Outlet Flow Rate And Temperature To Be Collected From Oem Data Sheet For The Engine. 6.#Supply All Materials Required To Complete The Jobs Incudes Ss Or Gi Pipes (Seamless Sch 40 Factory Galvanized) & Fittings Same As Existing At Site, Pressure, Tem Perature Gauges, Flow Meter And Gate Valves. 7.#Contractor To Carry Out Trial Test Prior To Installation With Flexible Hose To Achie Ve The Required Flow, Temperature And Pressure As Per Submitted Design. 8.#Detailed Installation Of The Work, Material To Be Submitt Ed By The Contractor For Dewa Approval.9.#Contractor To Propose Site Installations With Optimal Routing And Minimum Fittings. 10.#A Ll The Civil And Mechanical Work To Be Included In The Scope Of Work. 11.#Performance Of The Fire Diesel Engine To Be Verified Befor E And After Testing And Ensure There Is No Deviation 12.#Painting Shall Be Done As Per Paint Manufacturer#S Specification. Two Coat Of Red Oxide And Two Coat Of Gloss Red Paint By Mixing With Proper Ratio Of Base And Curing Agent With Thinner. Exposed Pipe Work Sh All Additionally Be Painted One Coat Gloss Red. 13.#Proper Rigid Support To Be Provided For The Installed Pipe. 14.#Flow Testing Of The Installation As Per Design Requirement. 15.#Contractor To Follow Dewa Ptw Procedure For All Site Related Visit And Work. All Nec Essary Tools And Tackles Required To Finish The Jobs Should Be Carried By The Contractor And Also Entire Work Should Be Completed Wi Thin 10 Working Days. 16.#Contractor Shall Accept Full Responsibility For Any Damage That May Be Caused To Any Plants Due To Neglige Nce. 17.#Warranty For The Installationsone Year Note: - For Site Visits And Ptw, Contact: Mr. Srihari Ramasubramaniam (04-32 29325 / 0559425174) And Other Technical Requirement Mr. Ahmad Alzarooni (Mob:0551144698) Qty: 1 Design, Supply, Installation And Testing Of Diesel Engine Cooling Line Drain Piping To Fire Water Tank At Hrsr 400Kv Substations. Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332300125
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 59300526
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.