Design And Construction Of A Gas Engine For A Thermal Well 45255000-9 Business-Construction-Design Contract In The Subject "Design And Construction Of A Gas Engine For A Thermal Well", With The Technical Content Detailed In The Public Procurement Technical Description. Design And Installation Of A Chp Gas Engine Generator, Gas Preparation Equipment, As Well As Operating Authorization For The Procurement Of Construction Investment For The Mh-T3 Production Well In Mórahalom 1. Required Technical Content The Aim Of The Project Is To Build A Technology That Is Suitable For Separating The Natural Gas In The Well Flow Of The Thermal Well And Treating It At Such A Depth That The Natural Gas Treated In This Way Should Be Available As Fuel For The Gas Engine Of A Micro Chp Unit. Tasks: 1. Licensed And Construction Plan Documentation With The Following Proposed Work Parts, As Well As All Other Documents Necessary For Implementation: ● Full Flow Separation With Full Carbon Chain ● Geodesy, Preparation Of Basic Design Map ● Soil Mechanics ● Planning Of Gas Separator, Gas Preparation, Storage And Chp Gas Supply, Atex Working Part With Zone Map ● Architecture, Statics, Description, Calculation, Plan, Small Power Plant Container Building, Tank, Supporting Structures, Foundations, Fence ● Fire Protection Plan Chapter ● Noise And Vibration Protection ● Hmke Connection Plan ● Electrical Execution Plan ● Settlement Measurement Plan, With Electricity Supplier Approval ● Electrical And Automation Planning ● Gas Engine Technology Planning ● Occupational Safety Plan Chapter ● Acquisition Of Installation, Operation, Operating Permits, Service Provider Approvals 2. Construction Of Gas Preparation Unit ● Hydromechanical Connection Of Thermal Well And Gas Preparation ● Connection Of Thermal Well Piped Gas And Gas Preparation Gas Pipeline ● Production Separator In Container, With Fittings And Automation ● Drop Separator Post-Separator With Fittings, Without Thermal Insulation ● Gas Cooling System, Connecting Cooling Line, Natural Air Cooler ● Installation Of Gas Preparation Equipment With Air Cooler 3. Chp Accompanying Gas Utilization Small Power Plant: ● Gas Preparation And Chp Gas Engine Small Power Plant Gas Pipeline Connection (Electric Power: 46 Kw; 50 Kva) 4. Complete Chp Gas Engine Small Power Plant Unit With Automation Without Emergency Cooler. Automation Provides Output Data Suitable For Integration Into The Central Control And Remote Monitoring System. Connecting A Power Plant To The Network, With Full Administration And Execution. 5. Test Operation With 24-Hour Error-Free Operation. 6. Safe Handover With The Following Recommended Work Parts, Such As, But Not Limited To: ● Testing Of The Construction Of The Electrical Automation Connection, Integration Into The Central Control And Remote Monitoring System ● Handing Over The Commissioning Permit For The Gas Preparation Plant ● Handing Over The Commissioning Permit For The Chp Gas-Powered Small Power Plant ● Confirming The Payment Of The Network Development Contribution ● If Necessary, Amendment Of The Mkeh Installation Permit For Gas Preparation And Gas Engine Power Plants ● Handover Documentation (Which Especially Includes Implementation Plans And Kku) The Contractor Is Responsible For Carrying Out Unlisted But Necessary Tests And Obtaining Plans.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 59272001
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.