Quotation Are Invited For Third Party Internal Inspection Of Auxiliary Boiler G Station Aux. Boiler Third P 1032204376Rfx Description Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. 1 Item-00001 Third Party Internal Inspection Of Aux Boiler 13 At #G# Station Phase I As Per Eiac-Rq-Ib-004 (Formerly Dac-Req-08) 1.#Third Party Inspection Of Aux. Boiler 13 Scope Of Work For Inspection According To Eiac-Rq-Ib-004 (Dac Req-08): 1.1: Pre Outage Inspection: A. Review Of Manufacturer#S Certification For The Boiler And Identification Based On Manufacturer#S Markings/Asme/Ce Markings. B. Review Of Records For Site Erection And Final Examination Results/Repair/Alteration Records. C. Visual Examination On All Access Ible Area. D. Review And Verify Thermography Reports E. External Visual Examination On All Accessible Area. F. Walk Down And P Unch List Reports Based On Findings And Interviews G. Recommendation For Nde Tasks To Be Performed During Inspections H. Review 1 Job Of Last Inspection Report I. Review Of Latest Operating Data From Control System Historian And Other Available Archives J. Inspe Ction For Vibration Of Pipe, Headers, Steel Structure, Etc. 1.2: Outage Inspection: A. A Visual Survey Of The Auxiliary Boilers General Condition, External Casing, Internal Air/Flue Gas Duct Side Mechanical Parts, Penthouse And Auxiliary Equipment Readily Acce Ssible Pressure Parts Etc. B. The Internal Thorough Inspection Constitutes A Visual Examination / Survey Of The Accessible Surface Of The Boiler Pressure Parts, The Tubes Headers, Accessible Supporting Arrangements, Refractory Lining, Drums, And The Internal Fit Tings In Order To Detect Any Sign Of General Or Localized Deformation/Deterioration. Where Applicable Or Necessary, Non-Destructive Testing Methods, Destructive Testing Of Samples, In-Situ Metallography Etc. Shall Be Used To Complement The Visual Inspection. C. External Visual Examination Carried Out On All Accessible Area. D. Visual Inspection And Witness Of Ut Thickness Measurement Of Hi Gh, Medium And Low-Pressure Steam Piping And Headers E. Visual Inspection And Witness Of Ut Thickness Measurement Of Pressure Vess Els And Piping Systems F. Review Of Thickness Measurement Records To Verify Whether The Current Thickness Is Not Less Than The Min Imum Allowable Wall Thickness G G Station Aux. Boiler Third Party Internal Insp. Work. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332202842
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 58691047
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.