Tenders Are Invited For Preparation Of Project And Estimated Documents Of The Construction Of The Grain Terminal. 1 Preparation Of Project-Estimate Documents For The Construction Of The Grain Terminal 1. Designing The Foundations Of Grain Storage Silos And Metal Structures Supporting The Silos; 2. Designing A Grain Storage Warehouse; 3. Designing The Supporting Metal Structures And Foundations Of The Chain Conveyors, Elevators And All Other Equipment That Allow Grain To Be Transported From The Dock Of The Heavy Cargo Terminal Of Baku Port To The Warehouse And From The Silos To The Wagon Filling Station On The Railway Lines; Service Subject To Tender: - Design Of Foundations And Supporting Metal Structure Of 25 Steel Silos With A Diameter Of 12.5 M And A Height Of 29 M, Each With A Grain Storage Capacity Of Approximately 2,000 Tons (Load Information Required For The Design Of Silo Foundations And A Schematic Sketch Of The Foundation Is Added). Attachments: Foundation_1223_Ce_R2 (Appendix 1 - Section 5) Foundation Load Sce 1223-16 T45 N80 V100 S0.21 C1500 V9 (Appendix 2 - Section 5) - A Granary With Dimensions Of 60 X 30 Meters And An Internal Height Of Approximately 10 Meters Design A Schematic Drawing Of The Warehouse Building Is Attached. Attachments: Baku Lay-0002 Layout1 (Appendix 3 - Section 5). - Design Of The Supporting Metal Structures Of Chain Conveyors, Elevators And All Other Equipment And The Foundations Of These Structures That Ensure The Transportation Of Grain From The Heavy Cargo Terminal To Silos And Warehouses, From The Silos To The Wagon Filling Station On The Railway Lines: The Content Of This System Can Be Summarized As Follows: 1. Ship Unloading To Be Placed At The Quay Equipment Rails (The Load Of The Ships Unloader Is Approximately 107 Tons); 2. Support Structures And Foundations Of The Conveyor Lines Leading From The Unloading Of The Ship To The Loading Of The Machine, To The Silo Feeding And Flat Grain Storage Warehouse (The Minimum Height Of The Bottom Of The Conveyor Lines Should Be 12 Meters As It Will Pass Over The Road In The Port Area); 3. Support Structures And Foundations Of Elevators To Be Used For Silo Feeding And Feeding Conveyor Lines In Silos; 4. Support Structures And Foundations Of Conveyor Lines That Ensure The Transportation Of Grain From Silos To Wagon Loading; 5. The Structural Frame Of The Wagon Loading Station And Its Foundations; 6. Support Structures And Foundations Of The Underground Parts Of The Wagon Unloading System And The Conveyor Line Carrying The Grain To The Silo; 7. Support Structures And Foundations Of Units For Management And Automation In The System. Attachments: "09625-Lay-0002-01 - Hopper Cone Silo" (Appendix 4 - Section 5) "09625-Pfd-0002-02 - Hopper Cone Silo" (Appendix 5 - Section 5) - System Power Supply Line Design (System The Total Electricity Requirement Is Determined To Be Approximately 4000 Kw. The Electricity Required For The System Will Be Drawn From The Main Transformer Building Located Approximately 500 Meters Away Via A 10 Kv Medium Voltage Cable. Is Reduced. Routes Of Electrical Wires And Cable Wires In The System Will Be Designed Based On The Manufacturers Design And Specifications); - Electrical, Sewage, Potable Water And Internet/Communication Lines For A Portable Container Office With Toilets To Be Located Near The Container Yard On The East Side Of The Grain Terminal In The Plan Drawing Of The Site Named "Annex 4 - Section 5 - 09625-Lay-0002-01 - Hopper Cone Silo" Designing Infrastructure Lines. Designing The Connection Of These Infrastructure Lines With The Nearest Available Lines; - The Supply Lines Between The Transformer And The Elements Of The System Will Consist Of Both Underground And Surface Roads (The Design Should Be Done In This Context); - Design Of All Infrastructure Lines For The System Such As Grounding, Lightning Protection, Low Current, Closed Circuit Camera System, Telephone And Internet Connections; - Conducting Soil Surveys, Geological Measurements And Preparing The Results In The Form Of An Official Report, Preparing All Necessary Supporting Documents (Environmental Part, Technological Part, Etc.); - Designing Solutions For Relocating Existing Infrastructure Lines, Water Channels, Etc. Under The Projection Of Newly Designed Parts Or Obtaining Protection Within The Constructions To Be Built And Preparing These Projects As Implementation Projects; - Creation Of Boq (Scope Of Work) Lists Of Work Items To Be Done In Connection With Newly Designed Sections And Corrections To Existing Infrastructure Lines (Indicating Pre-Accepted Marks For The Materials To Be Used In This Table); - Approval Of The Draft Document From The Required Relevant State Institutions Within The Framework Of The Requirements Of The Legislation; - Preparation Of Technical Conditions Related To The Work Envisaged In The Project 1 Unit. Tender Fees: Azn 350/- Non Refundable. [Disclaimer: The Above Text Is Machine Translated. For Accurate Information Kindly Refer The Original Document.] Tender Link :
Contact Information
Address
Ü.Hacib?yov 140, Tel: +994-0125990003 (3701)
Email
ahajiyeva@portofbaku.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 57827977
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.