Quotation Are Invited For D-Rep Whrb 11 & 13 Boiler Inlet Expansion Bellow Replacement. Expansion Joint Replacement Work At D - Station "Jebel Ali Power Station" Technical Specification And General Terms & Conditions T Itle: Expansion Joint Replacement At Whrb # For Boiler Inlet. # Total 1 Nos. Duration: 07 Days Expansion Joint Specification: Fab Ric Expansion Joint ,Dimensions 15460 X 7520 -300 + 2 X75 (R150 )- Fitted Length 450, Building Length 490, P 75Mm,Open With 500 Mm O Verlap For Each Joint, Holes - No Holes (To Be Done At Site) With Joining Materials And Kit, Contains Bolster No 1 Dimensions A/B (Mm ) 15460 X 7520 X (R150)- Fitted And Building Length 320 , Thickness 150 Mm, Contains Bolster No 2, Dimensions 15160 X 7220 X (Ro)-Fitted And Building Length 170 ,Thickness - 250 Mm,With Joining Material And Kit For Bolsters, For Whrb Inlet Duct Joint. Scope Of Work: Method Statements To Be Submitted Prior To Start Of Work. Risk Analysis For Work To Be Carried Out And Report To Be Submitted Prior To Start Of Work. Mobilize Men And Equipment. Tool Box Talk For The Work To Be Conducted And Copy To Be Submitted Pr Ior Start Of Work. Removal Of Expansion Joint Flange Connection All The Removed Bolt And Nuts Shall Be Cleaned And Lubricated Remove Fabric Out Layer. Remove Outer Bolster Bag Remove Inner Bolster Bag Cleaning Of Expansion Joints Bellow Connection Duct. Weld The S Upport Holding Hook With Casing For Inner Bolster Fix The Inner Bolster Fix The Outer Bolster Fix The Fabric Layer And Joining By We Lding (Heat Sealing) All The Bolts Nut To Be Torque Tightened. All The Required Tools And Tackles For The Installation Shall Be Brou Ght By Supplier Dewa Will Not Provide Any Tools And Tackles And Manpower. Housekeeping Of The Site And Proper Waste Disposal As Per Dewa Safety Rule. Work Completion Report Shall Be Submitted With Detailed Description And Phots. Work Period # Total 07 Days Warrant Y # One Year Technical Specification And General Terms & Conditions The Contractor Shall Visit The Site And Make Himself Fully Fami Liar With The Work Scope, Plant Access, Facilities, Complexities, Safety Measures Etc., Before He Submit His Bid The Contractor Sha Ll Submit The Schedule Of Work The Period Before Commencement Of The Work And Shall Be Approved By Dewa. Dewa Anticipates Maximum 3 Days All Dewa Safety & Environment Policy, Rules And Regulation Shall Be Followed At Work Site During The Execution Of The Work. T He Contractor#S Engineer Should Be Familiar With Safety Regulations While Working In A Hazardous Area. All Tools Required For The C Ontract Shall Be Arranged By The Contractor. All Rigging And Transporting Equipment Should Be Arranged By The Contractor. These Rigg Ing Tools Should Be Duly Tested And Certified By The 3Rd Party Inspection Agency And The Certificates Should Be Produced On Demand. Contractor#S Supervisor Shall Be Available At Site Throughout The Period Of Work. The Work Carried Out By The Contractor Shall Carry A Warranty For One Year And The Contractor Shall Attend Any Defects Come Out Of Bad Workmanship Etc. Free Of Charge Within This Per Iod. The Contractor Should Apply For The Permit To Work Well In Advance And This Request Shall Be Followed With Method Statement, Risk Assessment As Attachments Hot Work Permit Should Apply On Daily Basis. Entry Permits For The Workmen Should Be Applied With Passp Ort Copies Having Valid Visa. Persons, Whose Names Are Not Available In The List Will Not Be Allowed To Enter The Power House. Entry Permits For The Vehicle Should Be Applied With Copies Of Police Vehicle Registration. All The Workmen Should Wear The Uniform, Saf Ety Shoes And Helmet While At Work. Toolbox Talks Should Be Given To The Workmen By Their Supervisor Before Start Of Work. All Mater Ial And Tools Brought In Shall Be Declared At Power Station Security Gate And The List Of These Items Shall Be Signed By Dewa Securi Ty. The Copies Of These Documents Shall Be Lodged With Dewa Engineer In-Charge On Daily Basis. This Document Will Be The Basis For The Clearance (Gate Pass) To Take Them Out On Completion Of The Job. Dewa Scope: 1) Lc Arrangement. 2) Material: Expansion Joint, Nut Bolts Etc. 3) Scaffolding Where Ever Required. 4) Entry Pass For Contractor. For Site Visit Contact 1) Ashokgiri 0529174058, As Hokgiri.Gunsai@Dewa.Gov.Ae 2) Satheesh 0504069988, Satheeshkumar.Ramadoss@Dewa.Gov.Ae Qty: 1 D-Rep Whrb 11 & 13 Boiler Inlet Expansion Bellow Replacement Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332202602
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 57780955
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.