Quotation Are Invited For Supply, Installation, Testing Commissioning Of Water Tank And Related Pump Set. 3 Supply, Installation, Testing Commissioning Of Water Tank And Related Pump Set General Scope: Work Is To Provide All Engineering , Material, And Labor To Design, Construct, Supply, Install, And Commission A Domestic Drinking Water Tank With Foundation, And Pump System With Necessary Plumbing Fittings. The Parties Shall Visit The Site And Make Themselves Thoroughly Acquainted With Local Site Conditions, Nature And Requirement Of Work, Present Conditions And New Installations And Make An Assessment Of Labour And Material, Required Before Submitting The Price. Ø#All The Material In General Will Confirm As Per The Latest Standards And Shall Be Submitted To Dewa For Engineers# Approval. #The Offer Shall Be Conforming In Accordance With Dewa Energy Management Policy & Enms Manual. §#S Ection Includes: Designing Supply Installation Of The Water Storage Tank Tailored To The Specific Site Requirements. The Tank Shall Contain A Capacity Of 15000 Gallons With Standard Dimensions Or As Per Site Condition. The Tank Shall Be Glass Reinforced Plastic (G Rp) Or Equivalent. §#Disinfection Of Water Storage Tanks Is Required Before Putting Into Service. §#Construction Of The Tank Will Be Installed On The Reinforced Concrete Foundation Suitable To Support The Operating Weight Of The Water Storage Tank. Construction An D Design Of A Reinforced Concrete Foundation Are Included In The Scope. The Design Shall Be Submitted For Engineer Approval. §#Provi De And Install Float Switches And Flow Valves To Control The Level Of Water And All Tank Fittings And Connections. §#A Union Or Flan Ge Connection Between Lines And Tank Is Required To Ensure All Lines To Tanks Can Be Easily Removed From Tanks. §#Connecting Mechani Cal And Electrical Services To The Water Storage Tank To Include Utility Water Supply Connection Point. §#Providing, Installing And Connecting All-New Water Piping With Utility Water Supply, Which Shall Be Ppr Constructed On-Site. §#All Hangers And Pipe Support Mu St Be Galvanized Or Epoxy Coated Type. §#All Materials Will Be Supplied By The Contractor. §#All Civil Excavation Work Is Included I N The Scope. Section Includes #A Domestic Water Pump System With A Constant Pressure Booster System Including A Controls Control Pan El. Work Is Inclusive Of All Packaged Pump Systems, Field Piping And Wiring Connection. #Prepare The Basis Of The Design Duty Standb Y Booster Pump Set For Maximum Reliability And Efficiency. #Provide A Concrete Pad To Ensure A Secure Mounting Surface For Anchoring The Pump. #Provide & Install An Awning To Protect The Pump System From Direct Exposure To The Sun. #Isolation Valves And Flexible J Oint Connection Shall Be Provided At The Common Suction And Discharge Piping To Facilitate Maintenance, Accommodate Minor Misalignme Nt And Dampen Any Excessive Vibration. #Control Panel Shall Be Providing Ip 66 And Components (Mcbs, Relays, Contactors) Of Control Panel Must Be Made By Abb/Shineider/Ge/Siemens With Auto Manual Selector Switches. (With Sun Shade ). #The System Shall Be Capable Of Continuous Satisfactory Operation In An Environment With 50 Degrees Centigrade /80 Per Cent Humidity. #All Parts Of The Units In C Ontact With Waters Shall Be Manufactured From Materials, Which Is Conventionally Known To Be Non-Toxic, Non-Contaminating And Biolog Ically Inert. These Materials Shall Be Resistant To Internal And External Corrosion Or Protected From Corrosion By Suitable Surface Treatment. #Storage Tank, Including Its Water Fittings, Must Comply With The Regulations Of Dewa. #Obligation To Ensure That Hygien E Procedures Related To The Installation Of Water Fittings Are Followed During Installation Work. Pump Design And Construction: The Pump Shall Be 5.8 Kw Duty Standby Grundfos Vertical In-Line Multi-Stage Centrifugal Designed With A Motor Mounted Directly To The To P Of The Pump To Enable Easy Installation With The Control Panel. (Shall Be Submitted To Dewa For Engineers# Approval). #The Motor A Nd Pump Shall Be Of A Single Manufacturer To Ensure The Highest Performance According To The Designed Manufacturing Specifications. #It Shall Have Enclosure Class Of Ip55 And Of Class F Insulation With A Maximum Speed Of 2900 Rpm. #All Boosters Shall Be Designed T O Permit The Removal Of The Impeller Shaft And Bearing Without Disturbing The Suction And Discharge Connection. Shall Be Stainless S Teel. Pump Isolation: It Shall Be Possible To Isolate Any Pump For Maintenance Without Affecting The Performance Of The System In Th E Automatic Mode. Qty: 1 Supply, Installation, Testing Commissioning Of Grp 1500-Gallon Tank Qty: 1 Supply, Installation, Testing Commissioning Of Piping For Utility Connection And Outgoing Connection Qty: 1 Supply, Installation, Testing Commissioning Of Water Tank And Related Pump Set At Dewa Ruwyaha Trnsormer Work Shop As Per Attached Sp Ecification.Contact Person:Mr. Akbar / 0528682151 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332201744
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 54682561
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.