Tenders Are Invited For Construction Of Pirmam Physical Therapy Center In Primam/ Erbil Site Preparation, Cut&Fill Works With Demarcation: Earth Excavation In Trench Work, Shall Be Carried Out By Any Suitable Method According To The Lines, Grades & Dimensions, For The Foundation Of Walls, Back Walls For Floors, Walkways, Manholes, Septic Tanks, Water Pipes & Where Is Needed In All Types Of Soil Including "Rocky Layers" ,Dewatering The Trench Drying & Compacting The Bed, Backfilling The Trenches With Approved Material In Well Compacted Layers Not Exceeding 20Cm Thickness, All According To Section 2 Of I.G.T.S. And Instructions Of The Site Engineer. A1 Provide All The Machines, Materials, And Manpower Needed To Demarcate, Grading, Leveling The Land (+ - 15Cm) Taking Out All The Old (Concrete, Old Foundation, Asphalt,.....Etc.) Transporting All The Debris To An Approved Area By The Municipality. M² 550.0 A2 Cutting Works: Provide Machinery And Manpower To Cutting And Excavation In All Types Of Soils (Even Rock Layers, Asphalt Or Existing Foundation Concretes) For The Raft Foundation And Base Of The Retaining Walls According To The Design And Attached Drawings, The Price Includes Compaction Of The Excavation Base By Using Compactor And According To Details And Instruction Of Site Engineer. The Price Including Removing All Types Of Debris (If Needed) To The Location Was Indicate From Town Municipality. M3 120.0 (Er3.2) Construction Of Pirmam Physical Therapy Center In Primam/ Erbil Governorate 2022 7 A3 Filling Works: Provide All Machines, Materials And Filling With Approved Sub-Base Materials Type B Maximum Size Is 2" Up To The Required Level For The Building And Where Required Within The Area Of Building, Walkways, Garden, Etc. With Compaction (According To The Specification) In Layers 25-30 Cm Thickness, With Good Compaction Must Be Not Less Than 95% Mdd, And Using Anti Termite Chemical (Cloreddin) To Prevent And Treat The White Termite According To The Instructions Of The Manufacturer And Site Engineer With All Necessary Works. M³ 350.0 Sub Total A B Concrete Works: Including Supply Of Materials (Steel Reinforcement, Connection Steel Wires, Cement, Aggregate, Water, Sand, Plastic Cover For Fixing The Steel Reinforcement In The Proper Level, Bolts, Nuts, Washers, G. I. Pipes, Etc.), And All Necessary Works, According To The Section (600) Of I.G.T.S, Drawings And Instructions Of The Site Engineer. 1- All Support For Wooden Forms Work Should Be Steel (Jacks) And Fair Faced Wood. 2- Fy = 420 Mpa For All Steel Bars. 3. Allowable Bearing Capacity Of Soil = 120 Kn / M2 (Assumed). 4. Concrete Compressive Strength At 28 Days Based On Standard 150 Mm Cubes Should Not Be Less Than 25Mpa. For All Type Of Concrete. 5. The Reinforcement Details Should Be According To Aci Detailing Manual 2004. 6.Plywood Or Standard Formworks Must Be Used For All Structural Parts. B1 Raft Foundation: Provide All Machines, Materials, And Manpower Needed To Cast With 25 Cm Thickness Reinforced Concrete (Ready Mix C25) With Double Net Steel Bars Dia .12 Mm @30 Cm Center To Center Both Direction For The Foundation Of The Building , According To The Attached Drawings, The Work Includes Laying A Layer Of Thick Nylon, Shuttering, Using Vibrator, Using Copter Machine To Ensure A Fairface Surface, And All The Works Are According To The Specification Of Site Engineer. M3 125.0 B2 Reinforced Concrete Retaining Wall: Provide All Machines, Materials, And Manpower Needed To Cast Concrete Retaining Wall According To The Attached Drawings, The Work Includes Shuttering With Plywood, Using Vibrator, And All The Works Are According To The Specification Of Site Engineer. M3 30.0 B3 Lean Concrete: Provide All Machines, Materials And Manpower Needed To Cast Plain Concrete 7Cm Thickness, (Ready Mix C15) Under The Retaining Wall, According To Drawings, Specification, The Work Includes Excavation For Foundation Of The Retaining Wall, Compacting The Foundation Before Casting, And All The Works Are According To The Specification Of Site Engineer. M2 75.0 B4 Slabs: Provide All Machines, Materials, And Manpower Needed To Cast Reinforced Concrete (Ready Mix C25) With Double Steel Bar @12 Mm @20Cm Both Direction For Bottom Layer And For Steel Bar @12 Mm @30Cm Both Direction For Top Layer Of The Slab, Also For Concrete Over Door And Windows, According To Drawings, Specification, The Work Includes Plywood Frame Works With Steel Props, Using Vibrator And Copter Machine To Ensure A Fairface Surface, And All The Works Are According To The Specification Of Site Engineer. M3 95.0 Sub Total B 8 C Masonry Works For The Main Building: Including Provision Of Material, Erection, Pointing, Curing With All Necessary Work According To Section (5) Of I.G.T.S., Drawings, And Instructions Of The Site Engineer. C1 Hollow Concrete Block Works: Supplying Materials & Construction Of Walls With Hollow Concrete Blocks 20 X 20 X 40 Cm With Cement Mortar(1: 3) For Above Raft Foundation Level, The Price Includes Filling Vertically Joints Between Blocks By Cement And Sand 1:3 And All Required Works Must Be Conducted As Per The Specifications And The Attached Drawings. M³ 85.0 C2 Hollow Concrete Block Works: Supplying Materials & Construction Of Walls Portions And Parapets, Height According To The Drawings With Hollow Concrete Blocks 12 X 20 X 40 Cm With Cement Mortar (1: 3) The Price Includes Filling Vertically Joints Between Blocks By Cement And Sand 1:3, The Works Should Be Done According To Specifications, Drawings, And Instructions Of The Site Engineer. M2 105.0 Sub Total C D Electrical Installations: Electrical Points Including Provision And Installation Of All Wiring (Three Lines Line, Neutral And Earth Using Excellent Jordanian, Ksa Or Equivalent Quality). 1.5 Mm2 For Illumination And 2.5 Mm2 For The Rest), Inside Egyptian Pvc Conduits 20-25 Mm With Thickness 1.8 Mm Galvanized Boxes 0.9 Mm Thickness Cables Should Be Laid Inside Pvc Pipes, All Materials Like Switches, Circuit Bracker ..Etc. Must Be Form Original Brand And Good Quality Like Bg, Abb, Schneider Or Equivalent Quality. All Works Should Be Done According To Specifications And Instruction Of A Supervisor Engineer. D1 Supply, Install And Test Lighting Points Led Ceiling (40 Watt, 220Volt Transformer) (60*60)Cm With All The Required Using (Single Wires 1.5Mm² ), With All Necessary Materials .And All Required Work According To Instructions Of Supervisor Engineer. No 80.0 D2 Supply, Install And Test Lighting Points Led 20Watt (Outdoor) Water Proof. The Price Includes The On/Off Switch Light, Installing Of Photocells. And Must Be (Edison, B.G, Zonn, Bryton Or Ftm) Or Equivalent (If The Mentioned Brand Are Not Available) With All Necessary Materials .And All Required Work According To Instructions Of Supervisor Engineer . No 15.0 D3 Smoke And Fire Detector: Provide Materials, Skilled Worked To Install Smoke And Fire Detector Points (1 Per 16M2) Best Approved Type, With All Required Wiring Over The False Ceiling, Inside Tray Cable Or Pvc Pipe (If Required), The Work Includes Making The Suitable Core In The Walls To Pass The Looping Wire To The Rooms And Installing The Wires Inside The Tray Cable For All The Places Which Havent False Ceiling, And Required Works Should Be Conducted According To Site Standard Specifications. No. 30.0 D4 Two Zone Conventional Fire Alarm Control Panel: Provide Materials And Skilled Workers To Install Control Panel Of Two Zone Conventional Fire Alarm With Programing It Properly, Maintenance Alert, Installing Sounder And Freeze Warning, Using Manufacturer Protocol For Warning System, Installing Battery 12V Gel Type. All The Required Works Should Be Conducted According To Site Standard Specifications. No. 1.0 9 D5 Break Glass With Sounder: Supply, Install, And Test A Manual Call Point Break Glass With Push Bottom Switch And Install Break Glass With Sounder For Two Different Zones With All Required Works According To Standard Specifications. No. 2.0 D6 Provide 12Kg Automatic Fire Extinguisher Best Approved Quality (Min 1 Year Warranty) The Work Includes Fixing The Fire Extinguishers In Proper Way All Required Work According To Instructions Of Site Eng. No. 4.0 D7 Supply (Auto Fire Off) Fire Extinguisher Ball (Bomb) No. 10.0 D8 Supply, Install Ac Switches (32 Amp * 220Volt). (Edison, Zonn, Bryton, B.G Or Ftm) Or Equivalent, (Samples Required For Final Approval) With All Necessary Materials. The Work Should Be Done According To The Instruction Of Supervisor Engineer. No 10.0 D9 Supply, Install On/Off Switches (13 Amp * 220Volt). (Edison, Zonn, Bryton, B.G Or Ftm) Or Equivalent, (Samples Required For Final Approval)Using (Wires 2.5Mm² (Gc, Gcci, Hidayatm Ftm, Edison) Or Equivalent And With All Necessary Materials. The Work Should Be Done According To The Instruction Of Supervisor Engineer.). No 50.0 D10 Supply, Install And Outlet Plug (13 Amp * 220Volt). (Edison, Zonn, Bryton, B.G Or Ftm) Or Equivalent, (Samples Required For Final Approval)Using (Wires 2.5Mm² (Gc, Gcci, Hidayatm Ftm, Edison) Or Equivalent. The Work Should Be Done According To The Instruction Of Supervisor Engineer. No 45.0 D11 Supply And Install, Main - Distributer Board 36 Line Three Phase, The Price Includes Installation And All Required Work According To Instructions Of Site Eng. No 1.0 D12 Supply And Install By Using Best Type Jordanian Pvc Cable Size 3*2.5 Mm For Secondary Electricity Supply Network (Within The Rooms) Room Lighting +Outlet Sockets ,The Work Should Be Done According To The Instruction Of Supervisor Engineer.). M.L 400.0 D13 Connection The Building From The Main Switch To The Main Power By Using Best Type Jordanian Cable Size 4*20 Mm2 Primary Electricity Supply Tender Link :
|