Quotation Are Invited For G Mst: Fabrication And Replacement Of Ph-1 Fwp Base. G Station Feed Water Pump Base Frame Fabrication And Replacement Work Including Material G Station Feed Water Pump Base Frame Need To Fabricate And Replace With The Following Specification And Job Scope: Quantity: 3 Sets Scope Of Work: 1.#Mobilizing And Demobil Izing Of Work Force, Equipment, Tools, Consumables Etc. 2.#Measurement To Be Taken Prior To The Work. 3.#Tools And Equipment: Necess Ary Hand Tools And Equipment Etc 4.#Material: All Material Required To Complete The Work. 5.#Prefabrication Of Base Frame As Per Dra Wing And Sample (Site Measurement). 6.#Base Frame Will Be Fabricated With I Beam Same Size As Existing I Beam 7.#Decoupling The Moto R And Pump 8.#Removing The Pump Including Suction Discharge Flange Opening And Cooling Pipelines 9.#Removed Items Keeping In Arrange D And Safe Condition. 10.#Removing The Old Base Frame Including Concrete Work 11.#Installation Of The Pre-Fabricated New Base Frame With The Initial Site Measurement 12.#Aligning The Base Frame, Fixing It Including Concrete Work (Core Cutting, Casting Etc.) 13.#Ex Isting Cooling, Inlet And Outlet Pipeline Cannot Be Modified. 14.#Fix Back The Pump 15.#Alignment Of The Pump And Motor With The Fle Xibility Of Motor Movement In Future 16.#Alignment Shall Be Done By #Laser Alignment Device# 17.#All Auxiliary Pipeline Fix Back And Final Alignment Check. 18.#Inlet And Outlet Pipeline Should Be Fixed Back Like Initial Condition Without Any Extra Stress 19.#Contr Actor Should Protect The Plant And Surrounding Area During Work. 20.#Submission Of As Build Dimensional Drawing Of The Base 21.#Subm Ission Of Complete Method Statements With The Offer. 22.#Submission Of Risk Assessments Before Starting The Jobs At Site 23.#Replace Ment Work Will Be Carried Out On Site At Jebel Ali Power Station G Station 24.#Work Will Be Carried Out As Per Dewa Schedule, Schedu Le May Be Different For Each Unit Of Work 25.#Work May Be Carried Out In Overhaul Schedule In 2022-23 And/Or 2023-24 Schedule 26.#On E Unit Of Measurement Will Be Considered As One Frame Replacement In All Respect Completed Vendor#S General Responsibility And Liab Ilities: 1.#Contractor Shall Provide Supervisory, Skilled, Semi-Skilled, Unskilled Work Force, 2.#One Supervisor Should Be At Site D Uring The Work. 3.#All Required Tools, Equipment, Consumables Etc. Required To Complete The Job 4.#Contractor Shall Provide All Pers Onal Protective Equipment, First Aid Kit Available, Covid-19 Precautionary Kit At Site During The Course Of Works. 5.#Contractor Has To Complete The Work Within The Schedule Provided By Dewa By Increasing His Work Force Or By Round The Clock Work. 6.#If Any Existi Ng Pipes, Equipment, Instrument Or Any Establishment Damage/Loss During The Work At Site Will Be Repaired/Replaced By The Vendor Wit Hout Any Extra Cost. 7.#Contractor Shall Follow The Dewa Safety Policy 8.#Daily Progress/Review Meeting Along With Dewa 9.#Contracto R Shall Complete All Activities Within The Mutually Agreed Schedule 10.#Upon Completion Of All Works, A Formal Work Completion Repor T Shall Be Submitted. Mandatory For Bidding: 1.#Visit Site Before Submitting Offer. Scope Of Dewa: 1.#Forklift For Onsite Loading And Unloading 2.#Entry Permit For The Work Team 3.#Work Permit 4.#Motor Removal And Put Back 5.#Instrument Removal And Fix Back 6.#S Caffolding Work 7.#Water & Electricity From One Source As Per Site Availability Warranty: The Warranty Period For The Works Shall B E One Year From The Date Of Completion Of The Work. Contact: For Technical Clarification, Please Contact: Ezaz-0503493353/055509083 5, Email- Md.E@Dewa.Gov.Ae, Mr. Abdul Razzak-0555567949, Emailabdulrazzaq.Alkhaja@Dewa.Gov.Ae Mr. Mohammad Salmin- 0545549595 Emai L- Mohammad.Salmin@Dewa.Gov.Ae Mr. Najeeb Mohammed-0502838591, Emailnajeeb.Kunju@Dewa.Gov.Ae Qty: 3 G Mst: Fabrication And Replacement Of Ph-1 Fwp Base Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332201402
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 53234457
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.