Quotation Are Invited For Mechanical Service For Repair Of Gate Valve Mechanical Service For Repair 1032201516Rfx Description Mechanical Service For Repair Of Gate Valve Discs/Wedge Mmd-Mbr L1 Station Jebel Ali. Wo 510834879, More Information:Nadeem.Ahmad@De Wa.Gov.Ae, 04-81-40678 1 Item-00001 Technical And General Specifications - Outsourcing Work. L Station Phase I, Jebel Ali Name Of Work: #Scope Of Work For Mechanical S Ervice For Repair Of Gate Valve Discs/Wedge Mmd-Mbr L1 Station Jebel Ali. Wo 510834879 Total No. Of Valve Discs To Be Repaired:- 1 . Size 20 Inch Discs - - 1 Set Consist Of 2 Discs. Period Of Work: 4 Weeks From Discs Receiving Date (Discs Can Be Collected After Awarding The Po) Scope Of Work ·#The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Wor K Scope Before Submitting The Bid. ·#Party Shall Submit Complete Repair Procedure For Disc Repair Along With Submission Of Quote. ·# Party To Collect & Transport The Discs From Dewa L1 Station, Jebel Ali To Contractor Workshop. ·#Removal Of Complete Damaged Cladding Until Base Material Is Crack Free. ·#Discs Inspection By Liquid Penetrant Test/Ndt ·#Stellite 6 Welding On Laser Welding Machine F Rom Complete Seat Area In Thickness From Min 3.5Mm. ·#Discs Surface Grinding/ Lapping. ·#Final Measurement Control And Ndt. ·#Delive Ry Time 4 Weeks From Discs Receiving Date. ·#Party Will Arrange All Necessary Packing, Customs, And Logistics And Deliver The Discs To Dewa L1 Station. ·#Warranty For One Year To Be Provided. ·#Submit Full Repairing Report To Dewa Representative Including Ndt Repo Rts/ Step By Step Repair Photos/ Welding Procedure/ Walding Material Test Certificates Etc. ·#Previous Experience For Similar Type O F Work To Be Submitted. ·#Previous Po To Be Provided From Dewa Or Any Other Well-Known Company For Same Type Of Work. Dewa Scope ·#P Reparation Of Gate Pass Based On The Documents ·#Loading/Unloading The Discs On Contractor Vehicle Warranty ·#A Minimum Warranty Of 12 Months Shall Provide By The Contractor Starting From The Date Of Final Clearance From Dewa. ·#In Case Of Any Damage/Defect Of The Work Carried Out Under This Contract Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necessary Repair Wo Rk And Rectify The Defect Within Short Period Without Affecting The Production Of Electricity And Water. General Terms & Conditio Ns Technical Safety During The Work: ·#Contractor Staff Must Have Valid Gate Pass Before Entering The Plant Premises. ·#Contractor S Hall Give Daily Tool Box Talk, Risk Assessment And Dynamic Risk Assessment To Their Staffs. ·#Contractor Staff Involved In Any Activ Ity Shall Confirm The Availability Of Line Clearance (Lc) And Permit To Work (Ptw) Before Start Of Any Work. ·#Contractor Staff Must Check And Verify Of The Isolations Before Starting Of Any Overhauling Work. ·#The Contractor Shall Check The Condition Suitable To Carry Out The Work. Conduct Site Survey And Safety Inspection To Assess The Working Environment. ·#Contractor Shall Ensure Housekeep Ing Is Done On Daily Basis. ·#Contractor Site Supervisor Shall Be Continuously Present At The Work Site To Supervise The Job. ·#The Contractor Must Engage A Qualified Safety Officer To Ensure Observance Of Safety And Safe Working Practices By His Men At Site At Al L Time. The Safety Supervisor Shall Keep All Records (Tbt, Risk Assessment, Hot Work Permit, Ptw, Msds, All Safety Related Documents #). ·#Contractor Staff Involved In Any Activity Shall Use Appropriate Ppes Including Gloves, Helmet, Goggles, Safety Shoe And Mask E Tc. ·#Contractor Staff Shall Use Full Body Safety Harness When Working At Height. ·#Only Tested And Certified Rigging Tools Shall Be Used During The Work. All The Rigging Tools Must Have Valid Test Certificates And It Must Be Produce To Dewa Foreman/ Engineer Upon Request. ·#Contractor Must Be Ready With All Required Resources To Execute The Work As Per Agreed Scope Work During The Outage Sche Dule To Avoid Any Delay. ·#Daily Hot Work Permit Is Required Before Start Of Any Hot Work Like Welding/ Cutting/ Grinding/Drilling/H Eating Etc. ·#During Welding / Cutting Ensure That Welding Spark / Cutting Materials Shall Not Fall On Nearby Equipment. Adequate F Ire Blankets Shall Be Used During Welding And Cutting Work. ·#No Any Hot Work Shall Be Started Without Getting Hot Work Permit And W Ithout Fire Extinguisher Near The Work Location. ·#Daily Confined Space Work Permit Is Required Before Start Of Any Work Inside Conf Ined Space ·#Contractor Shall Ensure No Disturbance To The Nearby Operating Plant / Equipment. ·#Contractor Is Responsible For Any D Amage Or Effect On Installed Or Operating Machines /Equipment/ Properties. ·#Ensure Proper Handling Of Materials, Tools. Suitable Be Lts Are To Be Worn To Avoid Tools From Falling. ·#Safety Signs Shall Be Provided At Work Site And Wherever Required The Area Is To Be Barricaded For Safety And To Prevent Unauthorized Entry. ·#Contractor Staff Are Allowed To Work Only In The Authorized Work Place Designated By Dewa. ·#Contractor Staff Are Required To Wear Their Company Uniform & Carry Their Gate Pass Ids During The Work Inside Dewa Premises. ·#All The Safety And Security Procedures Of Dewa Shall Be Strictly Adhered. ·#In Case Any Accident/Near Miss/ Abnorm Ality, Shall Be Immediately Reported To Dewa Foreman/ Engineer. ·#The Contractor Must Engage A Certified & Experienced Rigger For Al L Lifting Activities ·#Contractor Shall Keep Valid Welder Certificate, Rigger Certificate, Welding Machine Certificate, Power Tools Testing Certificate At Site And Shall Be Produce To Dewa Foreman/ Engineer Upon Request. ·#Contractor Shall Keep The Msds For The Co Nsumables (Crc/ Wd 40 Etc.) Used At Site. ·#All The Welding Matching Power Cables, Welding Cables, Power Cables Must Be Tested And F Ree From Joints. ·#Cutting Set And Flame Heating Set Must Be Equipped With Back Fire Arrester. ·#Contractor Staffs Should Not Use Ex Pired Cutting Disc, Grinding Disc & Welding Electrodes ·#Contractor Supervisor Shall Inform Dewa Foreman/ Engineer/Operator Before U Se Of Service Air And Service Water. ·#Contractor Staff Should Not Use Instrument Air As It Can Cause Trip Of The Plant. ·#Contracto R Staff Should Not Go To Desal Area (Or Other Areas #.) For Lunch / Sitting / Sleeping. ·#Contractor Work Must Be Started Sharply At 07:30 Am And Shall Be Continue Up The End Of The Day. ·#If Any Work Will Continue After 18:00 Clock And During Off Days, Ensure Tha T Night / Holiday Permit Must Be Available. The Holiday / Night Work Permit Must Be Applied One Day Prior To The Holiday Before 10:0 0 Am. ·#During Holidays Contractor Shall Ensure That All The Resources But Not Limited To Sub-Contractor Manpower, Tools, Consumable S, Workshop Facility And Vehicles Are Available For The Smooth Execution Of The Work. ·#Contractor Has To Commence The Work Round Th E Clock / Double Shift (If Required) To Complete The Job Within The Agreed Duration. ·#Contractor Shall Work On 24 Hrs. Basis To Com Plete The Job On Time. ·#Job Shall Be Completed Within 7 Days Including The Rt, Ht, Insulation Fixing, Temporary Support Removal Etc . Waste Segregation And Disposal 1 Set Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332200931
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 51247477
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.