Quotation Are Invited For Corrective Maintenance 1032200707Rfx Description 1 Item-00001 Corrective Maintenance Of Lpg System At Dewa Staff Accommodation Building #A& B# Japs Equipment Details: 1)#Lpg System Staff Accommo Dation Building #A# Japs. 2)#Lpg System Staff Accommodation Building #B# Japs. Each Building Has An Individual Gas Room With Cylinde Rs Where The Main Manifold For Connecting Gas Cylinders Is Located. Down The Line, The First-Stage Regulator Is Located Along With The Electrical Shut-Off Valve. This Electrical Shut-Off Valve Is Interlocked With The Fire Panel And Shuts Off Gas In Case Of Fire Alarm Is Initiated In This Zone. Each Building Has 40 Apartments In Which The Gas Line Is Distributed Up To A Point In The Kitchen. In Each Kitchen Following Are Installed : 1.#Gas Consumption Meter 2.#Electric Shut-Off Valve Energized By The Switch And Interlock 2 Ea Ed With Gas Leakage Detector. Scope Of Work: The Parties Shall Visit The Site And Make Themselves Thoroughly Acquainted With Local S Ite Conditions, Nature And Requirement Of Work, Present Conditions Of The Existing Old System To Removal Safely And New Installation S And Make An Assessment Of Labor And Material, Required Before Submitting The Price. Scope Of Work Included Design, Supply, Install Ation Of New Tanks, Control Panels For Each Building Lpg System With Necessary Arrangements Of Wiring And Additional Piping, Additio Nal Filling Point, Damaged Parts Replacement, Sensor Calibration, Additional Testing & Re-Commissioning Of The Lpg System. Requireme Nts For Installation: All Equipment, Installation, Operation, And Corrective Maintenance Of System Must: ·#Fully Examined In The Fac Tory. ·#Approved By Dm ·#Designed And Installed By A Dm / Civil Defense-Approve Company. All Components Of Systems Must Be Made Fr Om Antirust And Corrosion Resistance Materials And Ideal For Use In Severe Climate Conditions Like In Dubai. ·#Compliance With The D M/ Civil Defense And Technical Standards And Specifications. Proposal Submittals: 1.#System Bill Of Materials 2.#Product Technical S Pecifications Or Equipment Brochures. 3.#Product Specifications. 4.#System Operation Diagram. 5.#Installation Operational Manual. 6. #Drawings & Requested Optional Accessories. 7.#Spare Parts List Delivery Submittals: 1)#Installation Manual, Which Includes Unpackin G And Installation Of All Systems. 2)#Operation Manual, Which Includes Start-Up And Operating Instructions. Completion Period: The Completion Period Of The Entire Work Shall One Month From The Issue Of The Purchase Order. The Work Shall Have To Be Completed Withi N Time And Shall Be Binding On The Contractor. The Design Concept Shall Consider The Following But Not Limited To. 1.#Lpg Tank A/G Cap. 1825 L With Fittings And All Necessary Accessories, Designed According To British Standard 5500 -1St Stage Regulator 2.#Lpg Fil Ling Point Ø#-Angle Filler Valve Ø#-C.S Pipe Sch.80 1 ¼ # Ø#-Cs Pipe Sch-40 ¾## Ø#-Safety Relief Valve Ø#-Alum Cabinet (Local). 3. L Pg Main Distribution Panel (Roof). Ø#-Isolation Valve ¾## Ø#-Pressure Gauge + Valve Ø#-Pressure Switch Ø#-Solenoid Valve 3/4#- 24V D C Ø#-Adj. High-Pressure Regulator 0-1.5 Bar 4. Lpg Distribution Pipe Work 5. Above Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 48949207
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.