Centralized Cooling And De-Humidification Sysem With Accessories On Turnkey Basis Centralized Cooling And De-Humidification Sysem With Accessories On Turnkey Basis , Supply, Installation, Testing And Commissioning Of Following Capacity Microprocessor-Based Ductable Inverter Ac Units With Scroll Type Compressor Along With Fast Charge Of Refrigerant Complete With All Components, Controls, Inter-Locking , Electrical Accessories I / C Air Cooled Condenser As Required. Back-Up Options Must Be Available When The Main Console Fails. Temperature To Maintain Between 20 - 28 Degrees With Humidity Up To 70% , A ) 11Tr Ductable Ac Unit With Scroll Compressor With Copper Coil Similar , Supplying And Installing Hard Drawn Copper Tube Duly Insulated I / C Cutting , Bending , Jointing, Brazing Etc. Complete With 9 Mm Thick Insulationas Required Of The Following Sizes. , ( I ) 7 / 8" , ( Ii ) 1 / 2" , Ducting Providing & Fixing G.I. Sheet Ducting I / C Plenum With Double Canvass Connections Along With G.I. Sheets Volume Control Dampers, Guide Vanes, Minor Civil Work Etc. Complete As Per Specification. , A ) 24 Gauge , B ) 22 Gauge , Pdg. Supply Air Duct Insulation With 25 Mm Thick Resin Bonded Glass Wool Insulation Density 24 Kg / Cubic Meter. Including Provision Of Vapor Barrier Covered With At Least 24 Gauge Aluminum Sheet , Supply & Fixing 1.1 Kv Grade Xlpe Insulated Pvc Sheathed Copperconductor Armored Cables Of Following Sizes On The Existing Tray / Surface With Saddles / Pvc Ties, End Terminations Glands, Lugs As Reqd. , A ) 4 X 10 Sq.Mm , B ) 6 X 1.5 Sq.Mm , C ) 2 X 1.5 Sq. Mm , Plumbing Providing Plumbing Work For Drainage Requirements I / C Supply Of Cpvc Pipe, Fittings Such As Bends, Reducer, Elbows, Tees, Unions, Flanges, Including Insulation Of Piping With 6 Mm Thick Nitril Insulation Sleeveetc. Asrequired , A ) 32 Mm , Cable Tray Providing And Fixing Following Size Of Perforated M.S. Cable Trays Including Horizontal And Vertical Bends, Reducers, Tees, Cross Members, Other Accessories Duly Suspended From The Ceiling With M.S. Suspenders Including Painting Etc. As Required:- , ( A ) 150Mm Width X 50Mm Depth X 1.6Mm Thickness. , Providing And Fixing 8 Swg Gi Earth Wire On Surface / Cable Tray For Loop Earthing Along With Existing Surface Conduit / Cable As Required. , Providing & Fixing Extruded Aluminium Powder Coated / Anodized With Double Deflection Supply Air Grill With Adjustablelouver, Volume Control Dampers In The Air Duct As Per Specifications And Free Area Not Less Than 60% Of Grill Area As Required , Heating Kit Comprising Strip Heaters, Thermostat, Humidistat, Safety Thermostat. The Minimum Capacity Of Heaters Shall Be As Indicated Below. The Heaters Should Be Arranged In Independently Operating Banks, In The Main Return Air At Suitable Location And The Controls Shall Be Housed In A Separate Factory Fabricated Box And Complete As Required. Heater Capacity Should Cater For All Seasonal Variations And Changes In Equipment / Product Load From 0% To 100%. Heater Bank Shall Be Operated Through Humidistat And Thermostat. Heaters Shall Be Connected In Equal Capacity Across Each Phase As Per Following. , A ) 6 Kw Strip Heater For De Humidification , Supplying, Installation, Testing & Commissioning Ofcubical Type Sheet Metal Of 16Swg Crca, 3 Phase & Neutral Mv Switch Board Suitable For Operation On 415V, 50Hz, Ac Supply Complete With Sign Writing Etc. And Incorporating The Following As Per Detailed Specifications. , I ) Busbar:- 300A Rating Three Phase & Neutral Al. Busbar ( Air Insulated ) Of Suitable Cross Section With Danger Notice Plate On Top Of Chamber , Ii ) In Coming:-A ) 4 Pole, 250A Mccb , 35 Ka Rupturing Capacity , Iii ) Outgoing:- , A ) 4 Pole, 63 Amp Mccb. .. , B ) 4 Pole, 32 Amp. Mccb .. , C ) Led Type Indication Light With Single Pole Mcb , D ) Power Contactor 12 Amps With On / Off Selector Switch , E ) Cable Alleys For All Incoming & Outgoing Ckt. Cable I / C Proper Supports / Clamping Arrangement. , F ) Digital Voltmeter & Ammeter ( 0-100A ) With Phase Selector Switch And Ct’S Of Required Retio With All Inter-Connection. , Supply Of 80Mm. Puff Panel, Both Side 0.5Mm Thick Ppgi Sheet Andother Side Ss 304 Sheet Puff Density 40± 2 Kg / M3 Supply Of 80Mm Thick Puff Slab Puff Density 40± 2 Kg / M3. Room Size As Per Site Requirement ( 2 Nos ) . , Emerson Make Condensing Unit:- , Khm 530 Pqb ( On R-407C ) :- , Evaporatorunit Luve Make / Patton :- , Copper Piping + Insulation + Accessories As Per Site Requirement :- , Temperature Controller ( Dixell Or Similar Make ) , Model No. Xr02cx :- , Expansion Valve :- , Electrical Panel For Both Machine :- , Charging Of Refrigerant R-407C / R-404:- , Drain Pipe + Other Accessories:- , Wiring + Pipe + Accessories As Per Site Requirement , Supply Of 80 Mm Thick Swinging Type Door, Both Side 0.5 Mm Thick Ss 304 Sheet. Puff Density 40± 2 Kg / M3 Door Size ( 900 Mm X1980 Mm ) Clear Opening With Biometric Entrance. , Supply, Installation, Testing And Commissioning Of Air Curtains In Top Of Entrance Door With Anodized / Powder Coated Aluminum Adjustable Lamellas, Airfoil Shaped, So That Air Discharge Direction Can Be Adjusted To 0 – 15 Degrees Either Side Low Noise Centrifugal Double-Inlet Fans With External Rotor Motors Suitable To, Operated Of 220 Volts, Single Phase, 50 Hz, Ac Supply, The Air Curtain Shall Be Suitable For 2.5Mtr To 3.5Mtr Height I / C Suitable For Following Details With Mounting Arrangement Etc As Reqd. , Supplying & Fabrication Of M.S Structure Form Made Out Of I Section, Angle Iron, M S Flate, M S Plate, Beam For Making Of Structurei / C Cutting, Welding & One Coat Of Red Oxide And Painting With Two Coat Enamelled Paint & Fixing The Same On Existing C.C Foundation Etc Complete As Reqd. , Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level. 1:1.5:3 ( 1 Cement : 1.5 Coarse Sand ( Zone-Iii ) Derived From Natural Sources : 3 Graded Stone Aggregate 20 Mm Nominal Size Derived From Natural Sources ) . , Steel Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Upto Plinth Level. Thermo-Mechanically Treated Bars Of Grade Fe-500D Or More. , Supply And Installation Of 70 Mm Thick Magnesium Oxide Board Drywall Tufbloc Partition System Having ( High Water & Fire Resistance ) Which Includes Two Layers Of Tufbloc Magnesia Square Board Having Square Edge & Size 2400 X 1200 X 10 Mm To Be Fixed On The Either Side Of The Gi Stud Channel Framework In Horizontal Position Of Length Side Board. The Frame Work Includes Floor / Head ( Fc 50 ) Channels Having Thickness 0.06 Mm Length 3600 Mm, Equal Flanges Of 32 Mm & Web Of 50 Mm Fixed To Floor & Ceiling With Suitable Fasteners At 300 Mm Centers Staggered Noise & Fire Rated Silicon Sealant To Caulked Along The Perimeter Of The Partition Frame Before Fixing Channels. Then Stud Channels Sc 48 Having Thickness 0.75 Length 3600 Mm, Un Equal Flanges Of 36 Mm & Web Of 48 Mm Should Be Placed Into The Floor / Head Channels Positioned Vertically At 600 Mm Centers. Horizontal Intermediate Channel At 1200 Mm Centers To Locked With The Vertical Studs. Extra Reinforcement To Be Provided At Openings ( Doors & Window ) . Apply Synthetic Poly Fiber 10 X 25 Is 50 Mm Width, 600 / 1200 Mm Density 1000 Gsm Filled Between The Studs & Held In Position By Using Chicken Mesh Wire / Pasting On The Board.Boarding Is To Done On Each Side Of Studs’ Framework In A Staggered Pattern By The Help Of Self-Drilling Screw At 300 Mm Centers.After Boarding Of Two Boards Jointing & Finishing Is To Be Done By Joint Compound. Appropriate Stair-Case To Go Up To The Top Part Has To Be Installed. The Flush Look Will Appear After Standing The Two Boards Joint Properly To Get A Smooth Look. The Technical Parameters Of The Boards - Density- 1000 Kg / Mt Cube Weight 10 Kg / Mt Sq, Fire -150 Min Acoustic Stc - 50 Db, Climate Ocrh - 50 , 99 Termite Resistance - Yes, Moister Absorbent - 6.8% After 2 Hr, Wet Expansion Less Than -0.02% From Ambient To Saturation, Moisture Movement - 0.02% Green - Rc % - 30 Strength - Anti Sag.Test Reports Of Manufactures Are To Submitted At The Time Of Delivering Of Materials And Before The Work Starts. , Lighting: Appropriate Lighting In All The Partitioned Areas With Warm White, Warm Yellow And Safe Green Light Of 535Nm Leds Must Be Fixed With Independent Control Switch And Timer Control Operation. Electrical Wiring And Safety Mcbs May Also Be Included. Cctv Control With At-Least 16 Ports Cameras With Biometric Entrance With Cards And With Thumb Impression. Hanging Halogen Lamps For Crop Growth Optimized Fluence Of About 1000Micrmoles On The Gi Grow Banks Also Needed To Be Installed On The Top Part Of The Partion. Appropriate Comfortable Sitting And Analysis Table Chairs Are Required On The Top Partition For 06 People. , False Sealing With Moisture Repellant Material Along With Led Lights Should Be Fixed. Gi Perforated Wheel Fixed Tables And Appropriate Sitting Arrangements On The Top Part Of The Hall Partition. Size 50 Mtr. X 25 Mtr. , Humidification Of Top Part With Installation And Commissioning Of Automatic Water Sprinkler System On The Top Part Of The Partition Facing The Roof With Appropriate Drainage To Main Exit Line. , Providing And Applying White Cement Based Putty Of Average Thickness 1 Mm, Of Approved Brand And Manufacturer, Over The Plastered Wall Surface / Wall Partition To Prepare The Surface Even And Smooth Complete. , Wall Painting With Acrylic Emulsion Paint Of Approved Brand And Manufacture To Give An Even Shade: Two Or More Coats On New Work , The Work Must Be Executed In Close Cooperation With Our Team And The Complete Stuff Should Carry A Minimum Of 2 Years Warranty.
|