Modification Of A Contract/Concession During Its Term: Construction Monitoring For: - Future Train, Revitalization Upva Public. Munich And S8 Incl. Marketing And Conveyor Technology Fire Protection Upva, 4. Ba, Stations Isartor And Rosenheimer Square Lot 1 And 2 Architectural, Engineering And Planning Services Short Description: Monitoring And Coordinating Are The Following Projects: Complete Bahn - Revitalization Underground Passenger Transport (Upva) Marketing Upva Replacement / New Construction Of Conveyor Systems Brandschutz Upva, 4Th Construction Section The Following Services Are Part Of The Measure: - Unlock 2 Basic Services Construction Contractual Technical Büw According To Annex 01.2.1 - Unlock 2 Services According To Vv Construction And Vv Construction-Ste Of The Eba According To Annex 01.2.3 - Unlock 2 Construction Technical Services Ta Building According To Annex 01.2.6 - Unlock 2 Waste Management According To Annex 1.2.7 The Project "Future Bahn" - Revitalization Upva Includes The Five Stations Of The Trunk Route Munich Hauptbahnhof (Mht) Carl Square (Mka) Marienplatz (Mmp) Isartor (With) Rosenheim Place (Mrp) And The Underground Stations Of The S8, Ismaning (Mis), Subföhring (Mufg) Airport Terminal (Mfht). As Part Of The Project, The Appearance Should Be Improved At The Eight Underground S-Bahn Stations In Munich In Order To Achieve Higher Customer Satisfaction. The Goal Of Modernization Is To Produce A Uniform Improvement In Terms Of Quality And Service Standards. In Addition To The Modernization Of The Platform Richs, The So-Called Distribution Levels (Pedestrian Flower) Are Also Attractive. The Focus Of The Revitalization Is The Five Stations Of The Regular Line Completed In 1972. The Three Stations Of The S8 Line Are Much Disciples And White A Smaller Modernization Requirement. 1.1.2 Project Marketing Upva Parallel To The Conversion Work In The Distribution Life Through The Revitalization Project Who Will Create New Marketing Areas In Some Stations. Affected Stations Are: Mka, Western And Eastern Distribution Level Mmp, Western Distribution Level, Here, If Necessary, Platform Plane With Western Distribution Level Mrp, Eastern Distribution Level 1.1.3Pro Project Exchange / New Construction Of Conveyor Systems The Project Relates Exclusively To The Conveyor Systems Of The Five Fixed-Distance Stations. Driving Stairs, Which Lead From The Plateau Towards The Distribution Plane Were Already Renewed In Previous Projects. Outstanding Is The Exchange / Renewal Of The Following, Conveyor Systems: Mht, 2 Elevators (1X Exchange, 1X New Construction In Vision) Of Platform For Distribution Level Mka, 2 Escalators In The Eastern Distribution Plane To The Terrain Surface Mmp, 1 Escalator In The Western Distribution Plane To The Terrain Surface With, 4 Escalators In The Western Distribution Plane To The Terrain Surface Mrp, 2 Elevators (Per Exchange), 4 In The Eastern Distribution Plane To The Terrain Surface And 1 Escalator In The Western Distribution Plane To The Terrain Surface 1.1.4Project Fire Protection Upva, 4Th Construction Section In The Fire Protection Upva Project, Extensive Measures Have Already Been Carried Out In Previous Construction Sections. The Aim Of The Project Is To Design The Structural Facilities And Facilities In All Upvas So That They Meet Todays Fire Protection Requirements. The 4Th Construction Section Of The "Fire Protection Upva" Project Includes The Two Stations With And Mrp And Includes The Last, Required Measures. With, New Building, Via Existing Tunnel Structure, As Well As Smokeuping System, Network Replacement And Elevator Mrp, New Smoking Plant On Platform Plane, Replacement Power Supply. Type Of Buyer: Utilities Entity Type Of Contract: Services Type Of Procedure: Negotiated Procedure Regulation: European Union Type Of Bid: Not Applicable Award Criteria: Not Applicable [Disclaimer: The Above Text Is Machine Translated. For Accurate Information Kindly Refer The Original Document.]
|