|
1. The Subject Of The Order Are Construction Works Consisting In The Construction Of A Sports Pitch With An Artificial Surface Along With Accompanying Infrastructure On The Plot With Registration Number 9/3 In Rawicz, Carried Out As Part Of The Budget Task Entitled: Construction Of A Football Field At Ul. Sportowa In Rawicz Along With Accompanying Infrastructure.2.The Subject Of The Order Includes The Execution Of Construction Works In Accordance With The Scope And Provisions Contained In The Swz Together With Annexes As Part Of The Budget Task Entitled: Construction Of A Football Pitch At Ul. Sportowa In Rawicz Together With The Accompanying Infrastructure1) The Scope Of Work During The Execution Of The Order Includes The Execution Of All Construction Works In Accordance With The Attached Design Documentation, Bills Of Quantities Together With Zero Cost Estimates And Applicable Regulations, In Particular: A) Preparatory Works: Surveying Measurements, Dismantling Of Sheet Metal Garages, Dismantling Of Reserve Boxes, Dismantling Of Goals, Dismantling Of Fences, Dismantling Of Concrete Slab, Dismantling Of Curbs And Edges, Dismantling Of Lighting Masts Along With Disposal, B) Construction Of The Pitch Surface: Earthworks, Coal Beds On The Ground, Crushed Aggregate Foundation (Layers According To The Design), Artificial Grass Surface With Parameters Specified In The Documentation, Grooves For Curbs And Curb Benches, Concrete Edging, Footing For Edging, C) Hardening Of The Area Around The Pitch: Earthworks, Sand Beds On The Ground, Crushed Aggregate Foundation (Layers According To The Design), Sand Ballast, Laying Meba Concrete Slabs, D) Fencing Works: Mesh Fence, Ball Catchers, Fencing Panel, Wicket, Gate, E) Equipment: Aluminum Goals (According To The Design), 12-Person Shelters For Reserve Players, Corner Flags, F) Pitch Irrigation System With A Tank, Valve Chamber, Sprinklers For Artificial Pitches, Control Cabinet, Piping, Cabling (Detailed Design Based On The Technical Design To Be Submitted For The Employers Approval), G) Pitch Lighting: Works Earthworks, Laying Casing Pipes, Making Cable Connections, Cabling, Masts With Foundations And Holders For Luminaires, Installation Of Luminaires, Grounding, Control Cabinet, Testing Of The Cable Line And Measurements Of External Lighting Intensity), H) Maintenance And Servicing Of Surfaces And Devices During The Warranty Period, I) Other Works Necessary For The Proper Execution Of The Order, J) Other Works Accompanying The Proper Execution Of The Works, In Particular The Removal And Disposal Of Rubble And Cleaning Works. Note: The Scope Of The Task Does Not Include The Construction Of A Cloakroom Building.3.The Detailed Scope Of The Order, Constituting A Description Of The Subject Of The Order, Was Determined By: 1) Design Documentation With Annexes, 2) Technical Specifications For The Execution And Acceptance Of Construction Works, 3) Bills Of Quantities Together With Zero Cost Estimates (Note: Lump-Su
|