1. The Subject Of This Procedure Is The Implementation Of The Task Consisting In Preparing Complete Design Documentation, Obtaining The Necessary Decisions, Opinions And Permits, A Final Decision On A Building Permit Or An Unprotested Notification Of The Intention To Perform Construction Works And The Implementation Of Construction Works For The Task Entitled: Construction Of Home Sewage Treatment Plants In The Byczyna Commune - Sarnów (Chudoba). The Scope Of The Investment Includes In Particular: 1) Design, Delivery, Installation And Commissioning Of Home Biological Sewage Treatment Plants (Pboś) Meeting The Requirements Of The Pn-En 12566-3+A2:2013-10 Standard, 6 Pieces; 2) Construction Of A Sewerage System (Sewage Installation/Connection) From The Outlet Of The Sewage System From The Building To The Treatment Plant Along With Inspection Wells; 3) Construction Of A System For The Discharge Of Treated Sewage To The Ground (Seepage Drainage Or Absorption Well) Along With A Control Well And - If Required - A Pumping Station For Treated Sewage; 4) Expansion Of The Electrical Power Supply To The Treatment Plant Equipment From The Buildings Internal Installation; 5) Carrying Out Commissioning, Testing Of Treated Sewage, Training User Representatives And Carrying Out Inspections And Service During The Warranty Period. 2. The Planned Project Is Located In The Opole Voivodeship, In Kluczbork County, In The Byczyna Commune, In The Town Of Sarnów (Chudoba), On Plots No. 26/4, 28/5, 30/18, 30/27, 30/36, 30/41, District 0054 Sarnów - Real Estate With Residential Buildings (6 Sewage Treatment Plants). The Properties Covered By The Planned Project (Plots No. 26/4, 28/5, 30/18, 30/27, 30/36, 30/41, Precinct 0054 Sarnów) Are Private Property. The Location Of Each Sewage Treatment Plant And Accompanying Elements Should Be Agreed In Writing With The Owner Of The Plot (Farm) At The Stage Of Preparing Design Documentation.3.As Part Of The Order, The Contractor Is Obliged In Particular To: 1) Carry Out A Field Visit, Make Additional Measurements And Agree In Writing With The Property Owner On The Location Of Home Sewage Treatment Plants, 2) Conduct, In Consultation With The Property Owner, Geological Research, Including Identification Of Soil And Water Conditions For The Purposes Of Implementing The Treatment Plant, Drilling And Developing A Geological Opinion For Design Purposes, 3) Prepare Design Documentation In Accordance With The Principles Indicated In Points 5, 6 And 7 Along With Obtaining The Authorization To Perform The Works By Submitting A Notification Together With The Required Attachments To The Kluczbork Staroste, In Accordance With The Provisions Of The Act Of July 7, 1994 - Construction Law.4) Obtain A Water-Law Notification Or A Water-Law Permit For Discharging Sewage Into The Environment, Based On Applicable Legal Provisions.5) Carry Out Construction And Assembly Works Within The Scope Specified In The Fup And The Design Documentation Prepared On I
|