|
1. Subject Of The Order: The Subject Of The Order Is The Construction Of 13 Bus Shelters For The Investment Called: Green Świdnik Project Under The European Funds For The Lubelskie Voivodeship Program 2021-2027 As Part Of The Integrated Territorial Investments Of Urban Functional Areas - Construction Of Green Stops In The Locations: Pzt-1 - 1 Pc. Ul. Niepodległości Next To The Spzoz Hospital, Plot Number: 1210, Precinct Number: 0001, Pzt-2 - 1 Pc. Ul. Niepodległości 3, Plot No.: 1210, 1212/16, Precinct No.: 0001, Pzt-3– 2 Pcs. Ul. Klubowa, Plot Number: 2009, Precinct Number: 0001., Pzt-4– 1 Pc. Ul. Nadleśna, Plot No.: 74/1, 89/2, Precinct No.: 0003., Pzt-5 – 1 Pc. Ul. Nadleśna, Plot Number: 130/5, Precinct Number: 0003., Pzt-6 – 1 Pc. Ul. Wyszyńskiego (Wiejska Nż 01), Plot No.: 323/41, 323/38, Precinct No.: 0006.Pzt-7– 1 Pc. Al. Nszz Solidarność / At Ul. Kopera, Plot Number: 184/14, Precinct Number: 0006., Pzt-8– 1 Pc. Al. Nszz Solidarność / At Ul. Modrzewiowa, Plot Number: 1359/5, Precinct Number: 0001, Pzt-9– 1 Pc. Ul. G. L. Okulickiego 20B, Plot Number: 1162, Precinct Number: 0001., Pzt-10– 1 Pc. Ul. G. L. Okulickiego 10, Plot Number: 1162, Precinct Number: 0001., Pzt-11– 2 Pcs. Ul. Wyszyńskiego / At Ul. Klonowa, Plot No.: 1331/1, 1341/1, District No.: 0001 1.1 The Scope Of The Investment Project Includes: 1) Demolition Works - Dismantling Of Existing Bus Shelters, - Dismantling Of Benches, - Dismantling Of Sidewalk Surfaces With Substructures, - Dismantling Of Remaining Infrastructure And Facilities To Be Liquidated - Disposal Of Dismantled Elements Not Intended To Be Rebuilt2) Assembly And Construction Works - Execution Of Earthworks And Preparatory Works - Ensuring The Functioning Of The Temporary Passenger Service Place For The Duration Of The Works, In The Event Of The Need To Temporarily Shut Down The Existing Stop, In Accordance With The Approved Temporary Traffic Organization And In Consultation With The Ordering Party And The Relevant Road Manager. - Construction Of Foundations For The Shelter, - Installation Of The Bus Shelter Structure, - Installation Of The Finishing Elements Of The Shelter, - Installation Electrical Installations (2 Sets At The Indicated Locations), Including: Distribution Cabinets, Wind Turbines, Photovoltaic Panels, Solar Controllers, Batteries, Led Lighting, Cameras, Radio Antennas, - Installation Of Green Roof Layers, - Planting, - Tests And Acceptance Of Completed Installations - Reconstruction Of Small Architecture Objects That Were Dismantled During The Works, I.E. Waste Bins And Others - Greenery Care 1 Year.1.2 The Works Will Be Carried Out 1-Stage.2. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 7 To The Swz - Opz, And Annex No. 8 To The Swz - Design Documentation And Detailed Technical Specifications For The Execution And Acceptance Of Construction Works.
|