Part 1: Construction Works Related To The Development Of The City Square At Ul. Browarna In Piła.1.The Subject Of The Order Includes In Particular: A) Construction Works: - Demolition Works, - Earthworks, - S And L Retaining Walls, - Road Slabs, - Pedestrian Paths With A Surface Made Of Clinker Cubes, - Pedestrian Paths With The Possibility Of Access By Cars With A Surface Made Of Clinker Cubes, - Pedestrian Paths With A Water-Permeable Surface, - Internal Road And Parking Spaces For Passenger Cars With A Water-Permeable Surface, - Grass Surface With Increased Load-Bearing Capacity, - Parklet, - Foundations For Additional Elements, - Information Board, - System Elements Of Small Architecture, - Elements Supporting Biodiversity, - Greenery, Including: Plantings And Lawn, B) Construction Of Park Lighting And Monitoring: - Construction Of Lighting, Including: Trenches For Cables, Protective Pipes, Power Supply And Installation Of Connectors For Powering Park Lighting Circuits And Devices During Events, Power Supply And Installation Of Connectors For Powering Devices During Events, Power Supply Telecommunications Cabinet, External Lighting - Park Monitoring, Including: Cable Ducting And Cctv Installation, C) Reconstruction Of Power Collisions: - Disassembly Works - Assembly Works D) Reconstruction Of Telecommunications Collisions: - Removal Of The Orange Polska S.A. Collision, - Removal Of The Netia S.A. Collision, - Removal Of The Asta-Net S.A. Collision, - Removal Of The Unidentified Operator Collision.2. The Detailed Scope Of Works And The Requirements Of The Ordering Party In Relation To The Subject Of The Order Are Specified In This Specification Of Terms Of Order, Including Technical Documentation Constituting Annex No. 11 To The Swz, Including: Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works, Bills Of Quantities, Formal Documents, Administrative Decisions Issued, Technical Conditions, Opinions And Arrangements And Other Documents Made Available. The List Of Applicable Documents Is Included In The Annex To The Swz - List Of Technical Documentation (Annex No. 10 To The Swz). The Attached Bill Of Quantities Should Be Treated Only As A Guide And Cannot Be The Only Basis For Preparing An Offer. The Contractor Is Obliged To Read All Documentation And Exercise The Greatest Care To Prepare Offers Correctly, And In Particular To Reliably Calculate The Offer Price Adequate For The Implementation Of The Subject Of The Order.4. The Remaining Obligations Of The Contractor Result From The Attached Draft Provisions Of The Contract (Appendix No. 9 To The Swz).5. After Signing The Contract, Within 10 Days The Selected Contractor Will Provide The Ordering Party With Completed Bid Cost Estimates, And Within 14 Days The Selected Contractor Will Agree And Submit To The Ordering Party For Approval The Material And Financial Schedule Of The Works Planned To Be Performed In Accordance With The Provisions Of The Dr
|