|
1. The Subject Of The Order Is The Execution Of Renovation, Construction And Conservation Works Of The Romantic Castle Building Belonging To The Museum - Castle Complex In Łańcut And Works In Its Surroundings, Including: 1) Demolition Works Carried Out In Stages, Necessary To Perform The Planned Construction, Renovation And Conservation Works, In Accordance With The Design Documentation And The Requirements Of The Relevant Conservation Services; 2) Renovation, Conservation And Reconstruction Works Of The Facade, Including Works Necessary To Restore, Protect And Preserve The Historic Values Of The Building, In Accordance With The Design Documentation And Conservation Guidelines;3) Renovation And Conservation Works On The Foundations, Including The Renovation And Protection Of The Buildings Structural Elements, While Observing The Principles Of Protection Of The Historic Substance Of The Building;4) Renovation Of The Roof And Attic Ceiling, Together With The Renovation Of Walls And Chimneys In The Attic, To The Extent Necessary To Restore The Proper Technical Condition And Protect The Building Against Further Degradation;5) Replacement Or Renovation Of Window Frames And Door, Taking Into Account The Need To Preserve The Historical Character Of The Facility And Conservation Requirements;6) Renovation, Conservation And Reconstruction Works Inside The Building, Including Renovation Of Floors, Ceilings, Internal Walls And Ceilings, Preserving And Restoring Historic Elements In Accordance With The Design Documentation And Conservation Guidelines;7) Execution And Modernization Of Sanitary Installations, Including: A) Replacement Of Water And Sewage Installations, B) Replacement Of Central Heating Installations, C) Implementation Of Ventilation Installations Mechanical, D) Installation Of Air Conditioning; 8) Construction Of New Electrical And Telecommunications Installations, Including High-Current And Low-Current Electrical Installations, Including: A) Installation Of A Fire Alarm System (Ssp), Along With Detectors And A Switchboard Enabling Communication With The Existing Fire Protection Control Panel Located In The Buildings Guard Room, B) Installation Of Closed-Circuit Television (Cctv), C) Installation Of An Intruder Alarm System (Sswin), D) Installation Of Access Control (Kd),E) Telecommunications Installation,F) Computer Network (Lan),G) Installations And Devices Necessary For The Proper Functioning Of The Facility In Accordance With Its Designed Purpose;9) Installation Of Internal Multimedia Devices To Implement New Functions Of The Building, In Particular Exhibition, Educational, Cultural And Service Functions;10) Reconstruction Of The Building And Adaptation Of Individual Rooms To New Functional Functions, Taking Into Account The Requirements Regarding Safety, Fire Protection, Energy Efficiency And Environmental Conditions Hygiene And Sanitary; 11) Carrying Out Construction Works Implementing The Facility Accessibility Plan, Including Adapting
|