|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing And Maintenance Of Ht/Lt Line Under Edd, Etawah; Electrical System Or Installation; Buyer - Carriage Of Following Poles From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Edd, Etawah Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , 11 Mtr. Long Stp-55 Pole , 9 Mtr. Long Pcc Pole , 8.5 Mtr. Long Pcc Pole , Carriage Of Line Materials I.E. Cable, G.I. Wire,Tpmo, Stay Rod, Pin/Disc Insulator, 11 Kv Cross Arm, Fuse Set, Angle, Channel Earth Wire, Distribution Boxs, Cable Jointing Kit And Etc.Other Required For Lt/11Kv/33 Kv Lines, If Any. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection Of Single Pole Structure By 8.5/9/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection Of Double Pole Structure By 8.5/9/11 Mtr. Long Pcc/St Poles, Including Fixing Complete Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Grouting Of 8.5/9/11 Mtr. Long Pcc/St Poles, Duly Grouted Including Necessories Clamps, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. (All Labour, T&P, Grouting Material Etc Arrenged By Contractor On His Own Cost). , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Resspo Drawing /Norms Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Carriage And Laying, Sagging Stringing And Binding Of Following Conductor On The Erected Pcc/St Poles Including Jumpering Of 11 Kv/Ht/Lt Lines As Per Resspo Manual And As Per Direction Of Executive Engineer. Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Acsr Weasel Conductor , Lt Abc (3X50+1X35+1X16) Sqmm , Lt Abc (3X95+1X70+1X16) Sqmm , Lt Abc (3X120+1X95+1X16) Sqmm , Replacement Of Following Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing As Per Resspo Norms. Including The Cost Of Labour, T&P And Carrier Etc. Required For Completion Of Work. , 11 Kv Pin Insulator With Pin , 33 Kv Pin Insulator With Pin , 11 Kv Disc Insulator With Fitting , 33 Kv F Clamp , 11 Kv F Clamp , T-Off Channel , 33 Kv Coss Arm V Type , 11 Kv Coss Arm V Type , 33 Kv Cross Arm Holding Clamp , 11 Kv Cross Arm Holding Clamp , Stay Clamp , Stay Insulator , I-Hook With Clamp , Dp Clamp , Gi Wire , Stay Wire , Transformer Oil Reclaimed , Straightening Of Pcc/St/Rail Pole Tilted Pole At Various Places By Straightening Of Pole Including The Cost Of Labour ,T&P Charges Required For Proper Completion Of Work. , Chopping Of Tree Branches To Clear The Line Route To Give Horizontal And Vertical Clearance To The Line Including Cost Of Labour T&P Etc. , Repairing/Resagging Of Old 11 Kv/Lt Line With Gi Wire As Per Resspo Norms. , Carriage Of Scrap Old Material Pole/Conductor From Pit Site To J.E Store Kunera Etawah Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.
|