|
Tender For Request For Quotation (Rfq) For 4Th Floor Interior Repair Work At Head Office. 1. Removing Of Old Existing Tiles Flooring Including Lifting Shifying And Carting Away From Site Etc.Complete. 2. Providing And Applying A Two-Component Epoxy/Polyurethane Floor Coating On Prepared Concrete Or Screed Surfaces, Including Thorough Mechanical Surface Preparation (Grinding/Cleaning), Application Of A Suitable Primer Coat, And Finishing With Two (Or More) Coats Of Approved Chemical-Resistant Resin To Achieve A Seamless, Uniform Finish, Complete As Per ManufacturerS Specifications And Site Directions. 3. Providing And Laying Vitrified Floor Tiles Of Required Size. Thickness, And Finish In True Line, Level.Sand Mortar Bed (1:6) Or Using Approved Polymer-Based Tile Adhesive, Finished With Neat Cement Slurry Or Cement Grout, Including Laying Of Spacers, Cutting, Chamfering, Surface Preparation (Hacking/Cleaning), And Post-Installation Curing And Cleaning 4. Providing And Filling Tile/Stone Joints With Approved Non-Shrink, Polymer-Modified Cementitious Or Epoxy Grout Of Matching Shade, Including Cleaning The Joints, Applying Uniformly, And Wiping Clean The Surface, All Complete As Per Manufacturer Specifications 5. Internal Painting: Removing Old Existing Paint And Providing And Applying 2 Coat Of Apex Altima Paints 1 Coat Of Primer And Putting For Prepare The Surface For Smooth Painting On Internal Wall. Including Scrapping Old Existing Paints And Preparing The Surface To Do The New Painting Work As Per Required. 6. Providing And Applying Oil Painting (Synthetic Enamel Paint) Of Approved Make And Shade On Internal Mild Steel (Ms) Structures/Surfaces At All Heights And Levels Including Scaffolding. The Process Includes Thoroughly Preparing The Surface By Scrapping, Wire Brushing, And Removing Rust, Scale, Or Grease; Applying One Coat Of Approved Zinc Chromate/Red Oxide Primer; Followed By Two Or More Coats Of Synthetic Enamel Paint To Give An Even, Smooth, And Uniform Finish. Rate Shall Include All Materials, Labor, Scaffolding, Tools, And Tackles Required To Complete The Work As Per Technical Specifications 7. Repairing Of Old Exiting Toilet Drain Pipe Line Of Building Terrace Including Required Material Scaffolding Etc.Complete. 8. Repairing Old Existing Door In Proper Manner, Replacing Old Hardware Fitting On Same Old Existing Door (Hinges, Handle And Door Closer Etc.) Etc Complete. 9. Providing And Fixing In Position Gypsum Board False Ceiling With 12.5Mm Thick Gypsum Boards, Screwed/Fixed To The Under Structure Of Suspended G.I. Grid Constructed And Suspended From The Main Ceiling Consisting Of Ceiling Sections Sections And Intermediate Channels. Including Labour, Material, Lifts Etc. All Complete. 10. Repairing Of Old Existing Storages Including Changing Of Hinges And Lock Etc. 11. Providing And Fixing Recessed Led Downlight Of Approved Make And Wattage (E.G., 7W/12W/15W), With Integrated/External Flicker-Free Driver, Complete With Necessary Wiring Connections, Cutout In False Ceiling, And Testing
|