|
Una :- Tender For Supply Of Construction Materials, Equipment And Related Services :- Construction Materials: Crusher Sand, Gravel, 10 Mm, 20 Mm And 40 Mm Aggregates, Stone Dust, Including Transportation Charges And Valid Transit Pass/Royalty, With Gst Extra. Soil And Waste: Supply And Transportation Of Soil, Debris And Other Waste Materials, Including Loading And Unloading Charges, At The Rate Per Trip.Bricks: First-Class And Second-Class Bricks, Including Transportation, Loading And Unloading Charges, Quoted Per Piece And Per Thousand. Cement: Supply Of Cement From H.P. State Civil Supplies Store, Tabbha, Including Transportation, Loading And Unloading Charges, Quoted Per Bag (Minimum 50 Bags).Steel And Binding Wire: Supply Of 8 Mm, 10 Mm, 12 Mm, 16 Mm, 20 Mm And 25 Mm Steel Bars And Binding Wire, Quoted Per Kilogram, Excluding Loading And Unloading Charges. Pvc Pipes: Supply Of Pvc Pipes Of 2.5-Inch, 3-Inch, 4-Inch, 6-Inch And 8-Inch Diameters, 4 Kg Pressure Rating, Is Standard, Quoted Per 6-Metre (20-Foot) Pipe. Shuttering Materials: Wooden And Iron Shuttering Materials On Rental Basis, Quoted Per Square Foot. Construction Equipment And Water Tanker: Mixer Machine (Including Fuel) And Water Tanker Services At The Worksite, Including Standing Tanker Rental Charges Per Day. Local Transportation: Local Vehicle Trips Within The Panchayat Area, Including Loading And Unloading Charges, Quoted Per Trip. Iron Chamber Sheets: Supply Of Iron Chamber Sheets, With And Without Sheets, Quoted Per Kilogram. Doors And Windows: Supply And Installation Of Door Frames, Shutters And Windows Made Of Imp Wood, Including Fitting And Fixing Charges. Rates To Be Quoted Per Running Foot For Frames And Per Square Foot For Shutters.Ceramic Tiles: Supply Of Wall And Floor Tiles In Different Sizes, Including Transportation Charges, Quoted Per Square Foot. Public Infrastructure Items: Supply And Installation Of Cemented Signboards And Concrete Benches With Armrests, Quoted Per Piece. Painting And Writing Work: Wall Painting And Lettering Work, Quoted Per Square Foot. Jcb Services: Jcb Cutting And Filling Work, Including Fuel Charges, Quoted Per Hour. For Development Work
|