|
Supply Of shell kit (lwscz) , lwscz shell kit (a) lscz - one coach set of roof, 2 mm sidewall and end wal l for lwscz coaches. 1) sidewall assembly to drg.no. (329) icf/sk3-1-4-091, alt b , col- 1 - 1 no 2) roof assembly to drg.no. (lwscz) 73916001, alt e, col-i - 1 no 3) end roof assemb ly to drg.no.(ls) 97216008, alt c, col-i - 2 nos. welding pin to drg no 81410012 alt nil to be a ssembled on roof and sidewall 4) endwall to drg. no. (lslrd) 74115001, alt k-2 nos. the firm shall fulfil the requirement as per icf//md/specn.200, issue status 01, rev 04 with amendment n o. 01. the firm shall fulfil the requirement as per icf/md/spec-315, issue status-01, rev.0 0, amendment no. 01. roof, sidewall and end wall to be supplied without applying etch primer. (b) one coach set of body shell items and partition frames for lwscz2(814) coaches to drg nos, 1. 81410002, alt nil- 1no 2. 81410005, alt f- 1 no 3. 58210036, alt c- 2 nos 4. 67010011, alt a - 2 nos 5. 58110017, alt c- 2 nos 6. aag10457, alt nil- 4 nos 7. aab10338, alt nil-16 nos 8. 581100 15, alt a- 6 nos 9. 58110016, alt a- 3 nos (c) under frame arrangemnt to drg no. 81411001 alt f the manufacturing facility as per icf/md/spec-147, issue status-01 rev.03. (d) 1. suppl y and installation of doors as per location of body side entrance door to drg no.(814)lwscz2-5-2-00 1, alt a. 2. stainless steel foot step to drg no.(729)lslrd/us-2-4-003, alt b- 4 nos 3. roof ventilator assembly to drg no (wlrrm) 018-7-3-405, alt m - 7 nos 3. locking strip to drg no. lg16260 - 28 nos . special condition : a) -packing as per icf/j&t/misc-2201, alt f safety instruction as per icf/j &t/sk-1867, alt. nil -packing as per icf/j&t/sk-1809, alt a. b) - packing condition as per ic f/j&t/sk-1865, alt b. c)packing condition as per drg.no.icf/j&t/misc-2487, alt c. the unde rframe should be supplied as normal side up and side bearer side down. installation re quired annexure-a dated 13.09.2023 to be followed. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before wel ding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty p eriod: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
|