1. The Subject Of The Order Is The Construction Of An Integrated Transfer Hub At The Oborniki Wielkopolskie Railway Station At Staszica Street In Oborniki.2.The Order Will Be Implemented In The Design And Build System In Accordance With The Terms Of The Contract. 3. The Entire Subject Of The Order Includes: 1) Preparation Of Design Documentation (Land Development Design, Architectural And Construction Designs, Technical Designs, Executive Designs, Traffic Management Designs, Collision Removal Designs, Etc. The Designs Should Be Developed On A Current Map For Design Purposes. The Contractor - On Behalf Of The Ordering Party, Will Obtain All Required Opinions, Technical Conditions, Arrangements, Permits And Administrative Decisions, Including The Decision Authorizing The Implementation Of The Road Investment. 2) Carrying Out All Construction Works In Accordance With The Scope Of The Order Based On Documentation Developed By The Contractor And Approved By The Ordering Party And All Necessary Preparatory Works Needed To Complete The Order And Perform All Activities Required By Construction Law. 3) Preparation Of Comprehensive As-Built Documentation, Including, Among Others, As-Built Surveying Inventory. 4) Preparation Of Comprehensive Cost Estimate Documentation For All Industries And All Works Covered By The Design Documentation With Quantity Calculation. 5) Authors Supervision At All Stages Of Project Implementation.4.Scope Of Construction Works: As Part Of The Investment, It Is Planned To Organize And Improve Traffic In The Area Of The Railway Station By Building A New Road System, Among Others. Mini Roundabouts With Maneuvering Roads With An Asphalt Concrete Surface, Bus Bays With A Stone Pavement, Parking Lots For Passenger Vehicles With A Concrete Or Asphalt Concrete Surface, Separate Pedestrian Roads With A Concrete Pavement, Roads For Pedestrians And Bicycles With A Concrete Pavement, Regular Exits With A Concrete Pavement, Covered Areas For Bicycle Racks, Small Architectural Structures (Benches, Waste Bins). Additionally, It Is Planned To Build A Lighting System For The Planned Communication System And A Telecommunications Network - Monitoring. Plantings (Trees, Shrubs, Low Greenery) Are Also Planned In The Investment Area. Rainwater And Meltwater Will Be Fully Managed Within The Boundaries Of The Plots Covered By The Investment In Question By Constructing, For Example, Infiltration Boxes, Absorption Wells Or Retention Tanks. The Final Selection Of The Device For Absorbing Rainwater Will Be Chosen By The Contractor Based On The Hydraulic Calculation Carried Out By Him Based On Geotechnical Tests.5.The Contractor, In Addition To Performing The Above-Mentioned Services And Works Is Obliged To Make An Information Board Regarding The Received Funding, Dimensions 240X120 Cm, With A Steel Structure, Mounted In A Concrete Footing. The Board Must Comply With The Guidelines Available On The Website At: Https://Funduszeue.Wielkopolskie.Pl/Komunikacj
|