1. The Subject Of The Order Is The Reconstruction After The Flood - September 2024, Of The Road Bridge In Walim, In The Walim Commune, Province. Lower Silesia. The Scope Of The Task Includes: • Demolition Of The Bridge Structure, Which Includes The Complete Dismantling Of The Existing Road Infrastructure On The Bridge And In The Sections In Front Of And Behind The Structure. It Is Assumed That The Existing Structure Will Be Demolished Along With The Front Walls; As Part Of The Task, The Existing Concrete Band Should Also Be Demolished To The Extent Necessary To Create A New Concrete Band, In Accordance With The Drawing.• Note!: After The Works Are Completed, The Retaining Walls Will Be Reconstructed For The Purposes Of Constructing A New Facility, The Strengthening Of The Stream Bottom Will Also Be Reconstructed, • Construction Of A Temporary Pedestrian Footbridge With A Usable Width Of 1.50 M. The Structure Of The Footbridge, The Method Of Support And Access Will Constitute A Separate Technological Design To Be Developed By The Contractor, • Protection In The Casing Pipe Of The Telecommunications Network (Orange), • Construction Of A New Facility, Including Equipment, • Reconstruction Of The Road Surface. The Newly Constructed Facility Will Have Class Ii Loads, Model Lm-1 According To Pn-En 1991-2. The Contractor Will Perform Archaeological Research And Perform All Formal And Administrative Activities In Accordance With The Decision Of The Conservator Of Monuments In Wrocław No. W/Arch.5161.270.2026.Jkb Of August 26, 2026, Including Arrangements For: - Colors, Method Of Processing And Material Of The Brick Cladding Of The Front Of The Arch And Vault, - Material And Method Of Processing Stone Cladding, With The Recommendation To Use Preserved Stone Material - Colors, Material And Pattern Of The Balustrade. The Detailed Scope Of Works To Be Carried Out As Part Of The Order Is Presented In Annex No. 5 To The Swz - Design Documentation With Attachments. The Bill Of Quantities (...) Is A Secondary Study In Relation To The Design And Technical Specifications And It Does Not Determine The Scope Of Work Covered By The Subject Of The Order. The Statements Included In The Bill Of Quantities Are Intended To Illustrate The Scale Of The Construction Work. The Bills Of Quantities Are Only Auxiliary Documents. The Design Documentation And Stwior Are Superior To The Bill Of Quantities.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 121064660
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.