|
Preparation Of Design And Cost Estimate Documentation As Well As Technical Specifications For The Execution And Acceptance Of Construction Works For The Task: Renovation Of A Residential Building At Ul. Warszawska 14 A, Plot No. 52/2, Precinct 5 In Mrągowo.4.2. Material Scope Of The Subject Of The Order: 1) Construction Design - 5 Copies 2) Bill Of Quantities - 1 Copy 3) Investors Cost Estimate - 1 Copy 4) Technical Specification For The Execution And Acceptance Of Construction Works - 1 Copy 5) Map For Design Purposes 6) Studies Should Be Submitted In Paper And Electronic Form On A Pendrive (The Text Part Of The Study In *.Doc [Ms Word] Or *.Pdf [Adobe Reader] Format, The Drawing Part In The Format *.Dwg Or *.Dxf And In *.Pdf [Adobe Reader]; Cost Estimate And Bill Of Quantities In *.Ath [Norma Or Other Compatible] Or *.Xls [Ms Excel] Format.4.3.Guidelines To Be Taken Into Account When Preparing Design Documentation: 1) Location: Plot No. 52/2, District 0005, Mrągowo City. The Facility Is Not Entered In The Register Of Monuments And Is Not Included In The Zone Protected By The Conservator Of Monuments. 2) The Investment Should Include The Renovation Of A Residential Building (2 Residential Premises With Location In Accordance With The Simplified Inventory Attached To The Swz) At Ul. Warszawska 14A In Mrągowo, In The Scope Of: 2.1) Residential Premises No. 2 - Ground Floor: 2.1.1) Installation Of A Bathroom And Toilet In The Premises, 2.1.2) Removal Of A Partition Wall To Designate The Remaining Part Of The Room As A Room With A Kitchenette (Applies To Rooms 2 And 3 Of The Premises), 2.1.3) Removal Of Tiled Stoves, 2.1.4) Replacement Window And Door Joinery, 2.1.5) Dismantling Floors (Adhesives), Floor Insulation, Laying Boards (Osb), Laying Terracotta, 2.1.6) Removing Old Plaster, Drying The Walls, Plastering And Painting, 2.2) Residential Premises No. 3 - 1St Floor: 2.2.1) Installing A Bathroom And Toilet In The Premises, 2.2.2) Removing A Wall Partition For The Remaining Part Of The Room To Be A Room With A Kitchenette (Applies To The First Two Rooms From The Main Entrance To The Premises), 2.2.3) Removal Of Tiled Stoves, 2.2.4) Replacement Of Door Joinery, 2.2.5) Dismantling Of The Floor Covering, Laying Terracotta, 2.2.6) Removal Of Old Plaster, Drying Of Walls, Plastering And Painting, 2.3) Additionally For Two Premises: 2.3.1) Reconstruction Of The Following Installations: Electricity, Water And Sewage, 2.3.2) Construction Of New Installations: Gas, Heating, Cold And Hot Water, 2.3.3) Reconstruction Of The Following Installations: Lighting And Plug Sockets, Water And Sewage, 3.3.4) Construction Of The Following Installations: Gas For Gas Stoves, Heating, Cold And Hot Water And Circulation, Sanitary Sewage, Hybrid Ventilation, Smoke Removal. 3) The Investment Area Is Covered By The Local Development Plan.4) The Concept Must Be Developed Within 4 Weeks From The Date Of Conclusion Of The Contract - The Ordering Party Will Approve The Concept F
|