|
Tender for Flash Butt Welding Of Rails Of 260Mtr Panel (60Kg Or Higher, New/ In Service) At Track Renewal Sites In Main Lines Over Ambala Division Under Sr.Den/C/Umb. , - Flash Butt Welding Of All Type Of 20 Rail Panels (60Kg Or Higher, New/In Service) At Site Using Contractors Own Mobile Flash Butt Welding Plant & Other Equipments, Machineries, Tools And Plants, Accessories, Consumables, Materials, Labour Etc. Complete As Per Following Details- A) In Case Of Welding By Mobile Flash Butt Welding Plant In-Situ Or On Cess, The Rate Quoted Should Include Earthwork In Formation With Contractors Own Earth Including Dressing Of Slopes Of Embankment, Leading Cut Soils To A Location/ Locations As Directed By The Engineer Or His Authorized Representatives For Stabling And Working Of The Mobile Flash Butt Welding Plant, Making/Cutting Of Existing/New Rail Panels For Flash Butt Welding Under Traffic Block, Cutting Of Existing Rails At The Joints So As To Remove Heat Affected Zone/Fish Bolt Holes Under Traffic Block, Flash Butt Welding Of Rails Including Insertion Of Closer Rails With Fittings For Movement Of Trains After Traffic Block Etc. Complete In All Respect, The Rate Quoted Should Also Include Pre Strengthening Of Rails, Matching Rail Ends, Preparation Of Aligning, Positioning, Stripping Of Rail Joints, Grinding And Finishing Of Joints, Usfd Testing Of Flash Butt Weld/At Welded Joints, Segregating Defective Rails, Post Strengthening Of Joints, Handling/Leading Of Rails/Rail Panels, Removing And Re-Fixing Off Fitting /Fastening, All Necessary Lifting, Pulling, Handling Of Rail Panels, Adjustment Of Welding Gap As Required, Loosening, Tightening, Removal, Re-Fixing, Of Fittings, Fastenings, Mobilization Of Flash Butt Welding Plant With Contractors Own Labour, Machinery, Tools, Plants Etc. With All Lead, Lift, Descent, Royalty, Taxes Etc. Complete In All Respects Per Direction Of Engineer Or His Authorized Representatives. The Cut Rails Shall Have To Be Returned To Pwi Depot By The Contractor At His Own Cost. The Contractor At His Own Cost Has To Establish Quality Control Organization To Ensure Adequate Control At All Stages. Unless Otherwise Superseded By The Stipulations Of This Contract, The Welding Process, All Flash Butt Welding Related Activities And Methodology Will Be Governed By The Manual For Flash Butt Welding Of Rails (April 2022)With Up To (Date Correction Slips Issued By Research Design And Standard Organization(Rdso) Ministry Of Railways Lucknow.- For 20 Rail Panels
|